ESC16-00406
| General Inspection | 4/24/2019 | 4/24/2019 | 4/26/2019 4:11:04 PM | | PEND |
|
|
Corrections needed:
- walk through inspection with site stormwater and erosion team is needed. Need to address erosion and runoff from lots 6-7 on block 2 Highland View - Clean out DI bags on north side of Sandpoint at bottom of hill.
Follow up scheduled.
|
ESC16-00353
| General Inspection | 4/24/2019 | 4/24/2019 | 4/25/2019 12:24:27 PM | | PART |
|
|
Wattles and berms on vacant lots need maintenance. No significant failures or eroded slopes observed.
Sediment runoff of evidence of erosion on lot 4 at top left of street needs to be cleaned up and additional controls installed.
Empty out storm drain sediment bags at bottom hill @ Club View/Pleasant HIll.
RP Cameron notifed
|
ESC17-00791
| Conference | 4/24/2019 | 4/24/2019 | 4/25/2019 8:33:02 AM | P | DONE |
|
|
Onsite meeting to discuss corrective actions at site:
- clean out installed storm drain sumps in the bottom of site drainage channel. - After crew repairs damage in channel, install some check dams to slow flow in this drainage channel - Clean up deposited sediment and mud that is on neighbors grass - remove old/damaged wattles that are on slopes and replace. - botttom corner of site should have a silt fence barrier installed to prevent any material leaving site and bypassing the storm drains - Install J-hooks on wattle installed along the top of the slope/edge of parcel. Make sure low spot has a stabilized where water can flow down to the drainage channel. - make sure drain on the common drive is not blocked or obstructed by gravel bags. Water should not flow off drive to the lots.
|
ESC16-01650
| General Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 12:52:32 PM | | CANC |
|
|
|
ESC19-00178
| BMP Violation | 4/24/2019 | 4/24/2019 | 4/24/2019 12:29:48 PM | P | FAIL |
|
|
Mult iple violations at site.
- No ESC permit sign visible. - No concrete washout containment, washwater dumped on ground. - No downslope perimter controls
Washout violation. Lasher construction has already been warned about washout requirements. Final warning. Washout containment or solution must be planned ahead of placement of concrete.
corrections: - provide new washout containment - post new ESC permit sign on a stake or board at entrance to site. - install wattle or silt fence along the bottom slope of site around the excavated backfill, in particular above the stormwater pond below. - pick up any loose trash or material after concrete crew and before the trash box is built
Re-inspection required, notify ESC inspectors when corrections are complete. Compliance date is next wednesday May 1st PM
|
ESC13-00806
| General Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 7:46:25 AM | | CANC |
|
|
|