PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, April 25, 2019
.
Number of inspections:
7
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00498
General Inspection
4/25/2019
4/25/2019
4/26/2019 4:13:03 PM
PEND
No offsite discharges or issues observed. Grass on slopes is growing. Areas where ECBs were installed are growing, but tenting is occuring due to plants lifting up the blanket. Error could be installing blankets over the wattles prevent good contact with the soil.
Will follow up with operator on fixing damaged sections of silt fence, and installing additional check dams along the access road to the stormwater pond.
Follow up scheduled
ESC18-00462
General Inspection
4/25/2019
4/25/2019
4/26/2019 2:33:54 PM
PASS
Construction appears complete. BLD is still open. Disturbed area stabilized and landscaped. Temporary BMPs (wattles) have been removed. ESC permit finaled.
ESC18-00467
General Inspection
4/25/2019
4/25/2019
4/25/2019 12:25:05 PM
CANC
ESC17-00455
General Inspection
4/25/2019
4/25/2019
4/25/2019 12:24:44 PM
PEND
ESC16-01395
General Inspection
4/25/2019
4/25/2019
4/25/2019 11:49:28 AM
CANC
ESC16-00938
General Inspection
4/25/2019
4/25/2019
4/25/2019 11:49:19 AM
CANC
ESC18-00109
General Inspection
4/25/2019
4/25/2019
4/25/2019 8:27:46 AM
PASS
NO signigicant trackout. Project staying within clearing limits and surrounded by preserved vegetation. RP stated that the disturbed slope above the driveway cut will get another hydroseeding and landscaping is starting to occur. No corrections at this time.