PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, April 26, 2019
.
Number of inspections:
10
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-01595
General Inspection
4/26/2019
4/26/2019
5/1/2019 1:59:57 PM
PASS
ESC19-00178
BMP Violation
4/24/2019
4/26/2019
5/1/2019 11:22:56 AM
P
PASS
Corrections completed:
- permit sign posted
- silt fence installed downslope of excavation
- concrete washout washwater containment set up on site.
ESC17-01473
General Inspection
4/26/2019
4/26/2019
4/29/2019 4:44:01 PM
CANC
ESC18-00462
DOC - Permit Finaled
4/26/2019
4/26/2019
4/26/2019 2:32:58 PM
P
PASS
ESC19-00140
Site Preparation
4/26/2019
4/26/2019
4/26/2019 1:47:06 PM
P
PASS
Jake ###-####
Building addition within existing mill compound. Perimeter paving and hardscaping to remain and will be used for stabilized construction access. Onsite stormdrain has been fitted with sediment protection. No MS4 inlets in area. Washout containment will be installed with the old loading ramp.
Approved for construction.
ESC18-00790
General Inspection
4/26/2019
4/26/2019
4/26/2019 12:04:59 PM
CANC
rescheduled for site final
ESC18-00392
General Inspection
4/26/2019
4/26/2019
4/26/2019 12:01:04 PM
PEND
ESC18-01687
General Inspection
4/26/2019
4/26/2019
4/26/2019 10:48:14 AM
P
PASS
RP Morgan to add additional construction entrance on Mtn. Cove road to improve access and avoid pedestrians and park users parking in front of the original entrance.
No trackout or discharges, BMPs installed. Crew working on excavating stormwater and flood control ponds.
Provided compost material test results, plan is to use as soil amendment and or blanket around the slopes of ponds on the edge of site. Another area could be at the slope below the entrance plaza with added wildflower mix.
Operator is working Parks and Rec and will involve public works with plan.
ESC18-00815
Aging Inspection
4/26/2019
4/26/2019
4/26/2019 8:17:38 AM
CANC
ESC18-00815
DOC - Permit Finaled
4/26/2019
4/26/2019
4/26/2019 8:17:34 AM
P
PASS