ESC15-01091
| General Inspection | 4/27/2016 | 4/27/2016 | 4/29/2016 4:09:38 PM | | PASS |
|
|
No activity. No violations.
|
ESC15-01100
| General Inspection | 4/27/2016 | 4/27/2016 | 4/29/2016 12:34:10 PM | | PASS |
|
|
no changes at site, no violations
|
ESC15-00955
| General Inspection | 4/27/2016 | 4/27/2016 | 4/28/2016 11:59:52 AM | | CANC |
|
|
rescheduled for 5/2
|
ESC16-00269
| Random Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 3:33:50 PM | P | PART |
|
|
note - RP Lavon # ###-#### (listed incorrectly in module)
Site BMPs installed and permit posted, but significant amout of dirt in gutter and evidence of transport downstream
Verbal correction request to perform thorough sweeping/clean up of gutter today to prevent sediment running off with irrigation water or stormwater.
Request also issued Annie with Redco Const. , work covered seperately under ESC15-01437
Lavon stated it would be done. Will check back thursday or friday.
|
ESC16-00434
| Site Preparation | 4/27/2016 | 4/27/2016 | 4/27/2016 3:24:12 PM | A | PASS |
|
|
ESC permit clearly posted. Site BMPs installed per ESC plan. RP familiar with ESC permit conditions. Concrete trucks equiped with mobile washout containers for disposal/reuse so no onsite washout required.
Approved for construction.
|
ESC15-00977
| Aging Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 3:04:00 PM | | PASS |
|
|
|
ESC15-01101
| General Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 1:35:22 PM | | PASS |
|
|
WIP on landscaping and finishing touches on interior. Lots of activity, will need to sweep up at end of day. No significant trackout, no discharges.
|
ESC15-01097
| Aging Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 1:14:02 PM | | PASS |
|
|
WIP on home and pool. No corrections needed at this time. No discharges or sediment leaving site.
|
ESC15-01288
| Tracking Control | 4/27/2016 | 4/27/2016 | 4/27/2016 12:57:26 PM | P | PASS |
|
|
Trackout cleaned up. New rock installed for construction entrance. Site still receiving dump trucks of fill dirt and no new trackout. Permit sign posted; no fugitive dust issues observed.
Some rocks & gravel have been dragged out so should be removed to prevent damage to vehicles & cyclists.
|
ESC15-01253
| DOC - Permit Finaled | 4/27/2016 | 4/27/2016 | 4/27/2016 12:53:52 PM | P | PASS |
|
|
First set of DHE Parkcenter Blvd townhomes is complete, landscaped, and cleaned. DI bags and other temp BMPs to remain until all units complete. No violations at site. All permits finaled.
|
ESC15-01252
| DOC - Permit Finaled | 4/27/2016 | 4/27/2016 | 4/27/2016 12:53:42 PM | P | PASS |
|
|
First set of DHE Parkcenter Blvd townhomes is complete, landscaped, and cleaned. DI bags and other temp BMPs to remain until all units complete. No violations at site. All permits finaled.
|
ESC15-01251
| DOC - Permit Finaled | 4/27/2016 | 4/27/2016 | 4/27/2016 12:53:30 PM | P | PASS |
|
|
First set of DHE Parkcenter Blvd townhomes is complete, landscaped, and cleaned. DI bags and other temp BMPs to remain until all units complete. No violations at site. All permits finaled.
|
ESC15-01250
| DOC - Permit Finaled | 4/27/2016 | 4/27/2016 | 4/27/2016 12:53:05 PM | P | PASS |
|
|
First set of DHE Parkcenter Blvd townhomes is complete, landscaped, and cleaned. DI bags and other temp BMPs to remain until all units complete. No violations at site. All permits finaled.
|
ESC14-00588
| Complaint Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 12:34:58 PM | A | PASS |
|
|
Complaint about damage to Logger's Creek bank and private property; second complaint response by ESC inspector(s) regarding the issue.
ESC division inspected area of irrigation water discharge at 9:45 AM. Water from a South Boise Irrigation ditch lateral is passing through site via pipe and lined pond area (to be landscaped). Design has been approved by the irrigation company per ESI.
No stormwater or dewatering from the site is going into the ditch. The water exiting the site from the ditch is visibly clear. After passing through the site perimeter silt fence the water flows over a grassy bank and some small washed river rock to line a section of the channel. The water does flow over some grass and several concrete bank stabilization blocks installed prior to construction activity. The vegetation on the bank has been preserved with the bank buffer zone between silt fence and creek. The flow of the ditch water may pass over a corner of the neighboring private property, unclear at time of inspection the exact boundaries. The irrigation district water master has been alerted of the situation, but the water has not been able to be shut off at this point.
Recommend that when project is landscaped/stabilized and silt fence removed and irrigation flow is less, that all construction materials (stakes, river rock) and other items be removed and irrigation ditch outlet either stabilized or allowed to revegetate.
No significant bank erosion was discovered, no turbid plume of water in Logger's Creek is observable. The occurrence is a non-turbid non-stormwater discharge not related to construction, and is not in violation of the City of Boise ESC permit.
Note: prior to development irrigation ditch was not piped and flowed into site to a pond/wetland area with an overflow connection to Loggers Creek. Water now does not infiltrate and is returning to the Creek.
|
ESC15-01579
| BMP Violation | 4/27/2016 | 4/27/2016 | 4/27/2016 11:46:06 AM | A | PEND |
|
|
check for corrective actions on dewatering failure at site. Check that Greenbelt has been cleaned up
Greenbelt path between site and Walling Creek has been scraped and cleaned up as requested. Water no longer flowing over Greenbelt or under Parkcenter Bridge to M. Willimans Park pond. Some water still ponding on grass and path between road and project that connects the sidewalk to the Greenbelt.
Project management decided to cease groundwater pumping and sewer/water line work until a plan to come into compliance is formulated and approved.
Project is in coordination with Boise Parks & Recreation to repair damage to grass and park property.
Requested that site submit ESC variance/modification documenting dewatering plan, treatment methods, and paperwork documenting agreement to repair damages incurred to the City property.
|
ESC15-01121
| Aging Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 9:19:24 AM | | PASS |
|
|
Home complete and area clean. No temp BMP removal required. Permit finaled.
|
ESC15-01121
| DOC - Permit Finaled | 4/27/2016 | 4/27/2016 | 4/27/2016 9:18:36 AM | P | PASS |
|
|
|
ESC15-01055
| General Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 8:48:23 AM | | PASS |
|
|
WIP on small commercial building within previously developed business park and prepped parcel. No loose sediment or discharges leaving site. Staging area and parking area have been kept clean.
|