Inspections for the day of: Tuesday, April 3, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00945 General Inspection4/3/20184/3/20184/6/2018 3:54:36 PM PASS
ESC17-01362 General Inspection3/20/20184/3/20184/5/2018 11:38:58 AMPPASS
Dewatering system is being setup. Plan is reportedly in progress and will be submitted to ESC division.

Dewatering anticipated to start Friday or Monday. No trackout, dust, or other issues at site.
ESC18-00168 Site Preparation4/2/20184/3/20184/4/2018 3:42:10 PMAPASS
Brett Phone #: ###-####
ESC16-01457 General Inspection4/3/20184/3/20184/4/2018 8:27:51 AM CANC
ESC17-00323 General Inspection4/3/20184/3/20184/3/2018 4:26:18 PM CANC
ESC16-01253 General Inspection4/3/20184/3/20184/3/2018 3:00:47 PM CANC
ESC17-00302 Conference4/2/20184/3/20184/3/2018 2:48:06 PMAPASS
RP-GC Dan notified that correction requests were received yesterday and new perimeter and hillside wattles have been installed today.

Other corrections in progress. Follow up inspection scheduled for Thursday AM.

ESC18-00497 Site Preparation4/2/20184/3/20184/3/2018 2:46:07 PMAPASS
Site preparation inspection and walk through conducted at 11 AM. Meeting with Kevin w/ Whitaker Construction, Public Works Inspector Gary Cooper, and the ESC Division (Long & Zawacki)

City of Boise ESC Permit sign posted at entrance on Joplin. Heavy duty construction rock entrance has been ordered and will be installed before end of week. A silt fence perimeter was installed on the east side of the site entrance to protect Thurman MIll from any stormwater sheet flow from site. Fence is properly trenched in.

Thurman Mill ditch & drain channel was rerouted prior to irrigation water release. The bank topsoil of old ditch was preserved and spread along the banks of the new channel and should regrow. Water is now passing through the ditch as of today.

2 well points have been installed and are now dewatering. The high flow pump is deep (25ft) and was discharging clear water, an energy dissipator fabric was put on end of hose and hose is in grassy drainage ditch. 2nd pump was low flow and land applying turbid water to infiltrate. An additional berm to prevent sheet flow to the ditch leading to Thurman Mill was requested and installed during the inspection.

Turbidity samples were taken upstream from discharge point and ditch connection in Thurman Mill reading 31 NTU. Sample in ditch where high flow pump hose was discharging was 7 NTU, and the water downstream in Thurman Canal after the discharges joining was 26 NTU.

Approved for construction. Initial BMPs installed. Will check back after more dewatering wells are installed and construction entrance. Notified RP about fugitive dust control requirements.
ESC12-00403 General Inspection4/3/20184/3/20184/3/2018 2:22:11 PM PASS
ESC17-00010 General Inspection4/3/20184/3/20184/3/2018 10:32:46 AM CANC
ESC16-01277 Aging Inspection4/3/20184/3/20184/3/2018 10:32:36 AM CANC