Inspections for the day of: Wednesday, April 3, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01119 General Inspection4/2/20194/3/20194/9/2019 7:17:42 AMAPEND
ESC17-00842 General Inspection4/3/20194/3/20194/8/2019 1:04:37 PM CANC
ESC18-01433 General Inspection4/3/20194/3/20194/3/2019 4:59:55 PMPPART
Corrections have greatly reduced turbid runoff from site. Two new correction requests issued to RP-GC John and gatorguard wattle installers.

- install j-hooks or checks to prevent water from channelling behind the perimeter sediment control gatorguard installed along the culdesac sidewalk.
- relocate upper silt fence that is supposted to retain and trap rooftop runoff water.

RP agreed to make corrections. Follow up next week.
ESC18-01244 General Inspection4/3/20194/3/20194/3/2019 4:57:24 PMPFAIL
Homeowner RP installed lined channel to direct roof top water off lot without eroded the dirt in front yard.

Arrived on site to see crew rinsing mud and stucco debris off sidewalk and street to gutter. Requested they immediately stop and sweep the material and no rinsing.

correction requests:
- secure lining for rooftop drainage with landscaped pins or more plastic sheeting
- clean up sediment trapped behind gravel check bags below project
- pick up loose trash, empty full trash bin and remove pile of wallboard
- sweep sidewalk
ESC18-00264 General Inspection4/3/20194/3/20194/3/2019 4:06:16 PM PASS
Landscaped. Open to check that slopes are stabile and will complete vegetation. May require removal of one of the DI bags installed on Sherman @ Mockbee
ESC18-01244 Site Preparation4/3/20194/3/20194/3/2019 4:05:20 PMPCANC
ESC17-00013 General Inspection4/3/20194/3/20194/3/2019 2:22:52 PM CANC
ESC17-00954 General Inspection4/3/20194/3/20194/3/2019 2:11:36 PMPPASS
All corrections listed in NOV and inspection request on 3/14 have been completed to reach compliance. Runoff retention and filtering/diversion has prevented more turbid discharges to lower Winsome.

Corrections/alterations needed in two locations on current plan:
- lot 7 perimeter wattle needs J- hooks or additional wattle up hill from last wattle to prevent water from channelling and running parallel to wattle and discharging near the gravel access road.
- lot 6 needs to install sediment controls on both sides of the construction entrance.

Note: lot 5 and lot 10 permitted seperately also have correction requests.
ESC18-00738 General Inspection4/3/20194/3/20194/3/2019 12:26:42 PM PASS
ESC18-00737 General Inspection4/3/20194/3/20194/3/2019 12:26:25 PM PASS
ESC17-01168 DOC - Permit Finaled4/3/20194/3/20194/3/2019 12:25:24 PMPPASS
ESC18-00236 Aging Inspection4/3/20194/3/20194/3/2019 8:25:49 AM CANC
ESC18-00273 Aging Inspection4/3/20194/3/20194/3/2019 8:25:27 AM CANC