Inspections for the day of: Tuesday, April 30, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01022 General Inspection4/30/20194/30/20195/6/2019 8:39:21 AMPPART
Inspection conducted last Thursday 5/2 PM. No trackout or discharges from site.

No recent construction activity. Slope vegetation is growing well in most hydroseeded areas.

At time of inspection, corrective actions on the erosion on the slope at the bottom of the subdivsion above Eyrie Way entrance have not had any repairs or reinstallation of wattles. Site needs to install/improve berms and/or other controls at top of slope to prevent water from concentrating in existing rills down the slope.
- no corrections yet on erosion that occured on the terraced lots on north side of Eyrie Way
- Site will schedule pre-construction/ESC conference with Superior construction prior to their activation.
- Finish removing fence poles from the safety fence.

Corrections should be completed within the next two weeks.
ESC16-01472 General Inspection4/30/20194/30/20195/3/2019 5:02:05 PM PASS
Driveway now has asphalt. House is occupied. Bond issued for revegetation and landscaping. Tempory BMPs and silt fence are installed and will need to be removed once stabilization and Logan alley road situation is resolved.

No issues observed.
ESC18-00078 Complaint Inspection4/30/20194/30/20195/3/2019 10:20:19 AMPPASS
WIP. No ESC violations observed.
ESC18-01021 General Inspection4/30/20194/30/20195/2/2019 3:07:00 PMPPASS
ESC17-00190 General Inspection4/30/20194/30/20195/2/2019 2:51:17 PM CANC
ESC18-01447 General Inspection4/30/20194/30/20195/2/2019 1:36:28 PMPPASS
Permit sign posted. Construction entrance and lined concrete washout installed and in use. Perimeter vegetation preserved and downhill wattles and silt fence installed in addition to vegetation. No corrections requested.
ESC17-01057 Site Final4/29/20194/30/20195/2/2019 1:35:12 PMAPASS
Construction complete. Distrubed area below pool has revegetated. No further ESC inspections.
ESC18-00503 Site Final4/30/20194/30/20195/2/2019 12:45:01 PMPNR
Not yet vegetated. Temp BMPs installed. Home is occupied.
ESC18-00885 Complaint Inspection4/29/20194/30/20195/2/2019 12:20:37 PMAFAIL
compaint that there is concrete (foundations) being poured for building


- uncontained concrete washout
- no ESC permit sign posted at time of inspection

Verbal warning to RP/GC. Hammett Homes will be doing all homes in subdivsion. Onsite conference scheduled.

Hammett Homes has been warned that nay futher uncontained washout at this site will result in parcel holds and re-inspection fee.
ESC18-00641 General Inspection4/30/20194/30/20195/1/2019 2:15:00 PM PEND
ESC18-00498 General Inspection4/26/20194/30/20194/30/2019 4:15:11 PMAPEND
RP to schedule onsite conference with ESC inspectors and developer
ESC16-00406 General Inspection4/26/20194/30/20194/30/2019 4:14:51 PMAPEND
RP to schedule onsite conference with ESC inspectors and developer
ESC18-00529 General Inspection4/30/20194/30/20194/30/2019 3:39:02 PM PASS
ESC18-00616 General Inspection4/30/20194/30/20194/30/2019 8:17:14 AM CANC
to be inspected with fab 51 final
ESC18-00834 Aging Inspection4/30/20194/30/20194/30/2019 8:15:45 AM CANC
ESC18-00834 DOC - Permit Finaled4/30/20194/30/20194/30/2019 8:15:39 AMPPASS
ESC18-00580 Aging Inspection4/30/20194/30/20194/30/2019 8:15:10 AM DEFR
inspected by BLD inspector