Inspections for the day of: Tuesday, April 4, 2017.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00948 General Inspection4/4/20174/4/20174/7/2017 3:05:59 PMPPART
No trackout. Neff Street will need sweeping next week. Currently demolishing small house under seperate permit. East end of Neff is soon to be paid. Will check in next week.
ESC17-00114 Site Preparation4/4/20174/4/20174/5/2017 3:33:08 PMPPASS
Phone #: ###-####

Approved for excavation. Subdivision BMPs installed.
ESC15-00957 General Inspection4/4/20174/4/20174/5/2017 3:30:23 PM FAIL
Need to clean up and remove existing concrete washout and dumped materials. Correction request already issued to Evan Construction & Tahoe.
ESC16-00397 Aging Inspection4/4/20174/4/20174/4/2017 3:58:51 PM CANC
ESC17-00241 Site Preparation4/4/20174/4/20174/4/2017 3:58:21 PMPPASS
Project has already started. Call me if you would like me to meet you there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
ESC16-01720 Site Preparation4/4/20174/4/20174/4/2017 3:57:29 PMPPART
On site contact for CM - Brandon ###-####

Construction fencing installed around work area, MS4 inlet protection bags installed.

Correction:
- need to adjust inlet protection to account for water entering curb cut
- post ESC permit sign at site entrance

ESC15-00853 General Inspection4/3/20174/4/20174/4/2017 2:44:51 PMAFAIL
Need to conduct maintenance on sediment filter bags on Hill Terrace. Sweep up North Hill sub entrance aprons. RP stated excess sediment on Hill Terrace due to recently replaced gas line. Crews in process of sweeping and removing loose dirt.

Developer stated excess soil stockpiles from site are to be hauled off next week. Will check back later in weekn
ESC15-00378 Site Final4/4/20174/4/20174/4/2017 12:04:28 PMPPASS
Rear hillside vegetation > 70% coverage. Home occupied and homeowner doing gardening/landscaping. Front driveway vegetation still establishing, area is confined with retaining wall. No temp BMPs in ROW. No further ESC inspections, permit finaled.
ESC15-00378 General Inspection4/4/20174/4/20174/4/2017 11:57:08 AM PASS
ESC17-00151 Site Preparation4/4/20174/4/20174/4/2017 11:37:22 AMPPASS
I need to get the Erosion inspection. ESC number is 17-00151 Phone #: ###-#### Inspection requested via web by Trevor Mills

Permit sign posted. Roadside vegetation preserved. MS4 inlet south of site on 36th has inlet protection installed.

Approved for construction.
ESC17-00151 Site Preparation4/4/20174/4/20174/4/2017 11:21:29 AMPCANC
BLD17-00375 BLD-Other4/3/20174/4/20174/4/2017 11:21:19 AMACANC
I need to get the Erosion inspection. ESC number is 17-00151 Phone #: ###-#### Inspection requested via web by Trevor Mills
ESC17-00029 Site Preparation4/4/20174/4/20174/4/2017 11:20:34 AMPPASS
Dean Phone #: ###-####


Permit signs posted at site. Concrete washout bin provided onsite. RP-GC on site for inspection. Storm drain inlet to the east on Poplar will have filter mat installed. Driveways will be installed on alley, no new curb cutting

Will check back for inlet protection next inspection
ESC17-00026 Site Preparation4/4/20174/4/20174/4/2017 11:19:09 AMPPASS

Permit signs posted at site. Concrete washout bin provided onsite. RP-GC on site for inspection. Storm drain inlet to the east on Poplar will have filter mat installed. Driveways will be installed on alley, no new curb cutting
ESC17-00152 Site Preparation4/4/20174/4/20174/4/2017 11:17:32 AMPPASS
Dean Phone #: ###-####

Permit signs posted at site. Concrete washout bin provided onsite. RP-GC on site for inspection. Storm drain inlet to the east on Poplar will have filter mat installed. Driveways will be installed on alley, no new curb cutting
ESC16-01475 Complaint Inspection4/4/20174/4/20174/4/2017 10:42:24 AMPFAIL
No washout containment provided for foundation crew. Spilled slurry and aggregate in unpaved driveway.

RP to clean up today and provide lined designated washout for remaining cement work.
ESC16-00233 General Inspection4/4/20174/4/20174/4/2017 8:08:51 AM CANC
ESC16-00430 General Inspection4/4/20174/4/20174/4/2017 8:08:42 AM PASS
No trackout to Ustick. Building structure is complete, site work in progress. Will need to make sure they remove temp DI bag upon stabilization. NO corrections at this time.
ESC16-00406 General Inspection4/4/20174/4/20174/4/2017 8:05:28 AM PEND
Slopes are in good condition with ECB and seeded grasses starting to grow. RP to provide seed mix details and ECB specs to analyze potential for some alternative revegetation tactics.

Correction request:
- conduct maintenance on rock construcction entrance on HV road
- change out DI bags on HV road.

Will check back this Thursday



Corr
ESC15-01391 General Inspection4/4/20174/4/20174/4/2017 7:53:12 AM CANC