Inspections for the day of: Wednesday, April 4, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01180 Site Final4/4/20184/4/20184/10/2018 8:09:58 AMPNR
Earthwork occuring for Adare Manor. Need to get ESC17-00847 issued.
ESC17-00249 General Inspection4/4/20184/4/20184/6/2018 3:55:19 PM FAIL
Muddy construction entrance needs to be replace with rock entrance or blocked off.
ESC16-00741 General Inspection3/21/20184/4/20184/6/2018 3:54:29 PMAPASS
No trackout. Storm drain inlet protection installed and maintained.
ESC17-00018 General Inspection4/4/20184/4/20184/6/2018 1:16:07 PM PASS
SFHs in progress by Blackrock, Hunter Homes, and Z. Evans.

No significant trackout, no over full trash bins, or spills observed. Storm drains have sediment filter bags installed.

Trash along Eckert has been picked up.

ESC15-01210 Site Final4/3/20184/4/20184/5/2018 2:40:32 PMAPEND
Temporary storm drain protection inlet bags that were clogged have been removed as requested. Will close out permit when I can verify that open lots individually owned will have perimeter controls or hydroseed/tacifier application.
ESC16-01650 General Inspection4/4/20184/4/20184/5/2018 11:58:59 AM CANC
ESC14-01083 General Inspection4/4/20184/4/20184/5/2018 11:37:37 AM PASS
WIP on final block. Framing complete, center open area not yet landscaped. DI bags still install on stormdrains. Trash has been picked up around site and in the adjacent stockpile area.

No violations observed.
ESC17-00954 General Inspection4/4/20184/4/20184/4/2018 3:29:02 PMPPEND
Site walk through inspection conducted Monday 4/2 11:15 AM

Crews have completed earth work and check dam installation onsite to reduce amount of water and runoff velocity that will reach the temporary retaining pond at bottom of site.

Heavy duty construction entrance installed.

Rock Placing Company installing retaining walls between terraced parcels.

Correction request:

- plan for hydroseeding to limit fugitve dust
- finish clean up around Winsome and BB Road storm drains.

ESC18-00018 Site Final4/4/20184/4/20184/4/2018 2:54:52 PMPPASS
Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
ESC17-00446 General Inspection4/4/20184/4/20184/4/2018 8:19:58 AM CANC