MIS18-00111
| ESC-Conference | 4/5/2018 | 4/5/2018 | 4/10/2018 12:44:03 PM | P | FAIL |
|
|
ESC conference - water/sewer line installation
Amount of disturbance and lack of clean up post installation requires ESC permit until permits are pulled with the BLD for homes.
Request to parcel owner to pull ESC General Permit. No ESC plan required due to less than 1 acres, flat lot, no MS4 inlets on Hilton.
|
ESC17-00302
| General Inspection | 4/3/2018 | 4/5/2018 | 4/9/2018 3:19:10 PM | A | PART |
|
|
Perimeter wattles have been re-installed along bottom of slope below home. Street and gutter in front of home were cleaned prior to most recent storm.
Corrections: - Re-install hillside wattles on west side of home that are damaged/or have mud overtopping them - smooth out any large rills/channels formed on the slope. - remove any mud/dirt behind wattles to allow more capacity for next event - sweep dirt in valley gutter at corner of lot. Some sediment runoff is also coming from driveway up hill from site.
|
ESC16-00225
| General Inspection | 4/3/2018 | 4/5/2018 | 4/6/2018 1:43:31 PM | A | PASS |
|
|
Earthen berms and stockpiles have been placed where water was creating channel to stormwater pond/basin.
No new erosion issues on slopes, disturbed areas have revegetated, trackout, or other violations observed.
|
ESC17-00503
| General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 11:58:47 AM | | CANC |
|
|
|
ESC17-00502
| General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 11:58:37 AM | | CANC |
|
|
|
ESC17-00504
| General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 11:58:27 AM | | CANC |
|
|
|
ESC17-01491
| General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 11:43:53 AM | P | PART |
|
|
Follow up inspection. Dewatering was completed last Friday. Temporary holding area has now almost infiltrated. Silt fence across creek has bee removed. No turbid water in Walling Creek from site. Water levels have also been raised in creek.
Corrective actions to complete as project wraps up: - sweep and clean staging area/parking area at MA Williams park. - pick up windblown trash up stream from bridge. - pay special investigation fee applied for last weeks turbid discharge and associated time spent by ESC division to request and obseve corrective actions as well as sampling.
|
ESC17-00286
| Random Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 10:39:14 AM | P | PASS |
|
|
Driveway entrance to street has been installed. Some materials are staged on lot. No trackout or loose trash around site. No SFH activity yet.
|
ESC17-00518
| General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 10:23:19 AM | | PASS |
|
|
Project near completion. No distrubed area adjacent to road. Addition in grassy back yard. BLD open.
|
ESC17-01002
| General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 10:14:00 AM | P | PASS |
|
|
WIP on frame. Project adjacent to Loggers Creek. Bankside vegetation preserved and is good buffer. Two rock construciton entrances installed.
ESC permit sign posted. No corrections requested.
|