PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, April 6, 2018
.
Number of inspections:
23
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-01346
General Inspection
4/5/2018
4/6/2018
4/12/2018 8:17:32 AM
A
CANC
ESC17-01360
General Inspection
4/6/2018
4/6/2018
4/6/2018 4:04:35 PM
P
PASS
ESC16-00439
General Inspection
4/6/2018
4/6/2018
4/6/2018 4:04:24 PM
P
PASS
ESC17-00519
General Inspection
4/6/2018
4/6/2018
4/6/2018 3:59:05 PM
P
FAIL
Corrections:
- construction entrance or sweeper on site.
- post green ESC permit sign on SWPPP
WIP on installing road base.
ESC17-00406
General Inspection
4/4/2018
4/6/2018
4/6/2018 3:54:05 PM
A
PASS
ESC14-00206
Site Final
4/6/2018
4/6/2018
4/6/2018 2:50:20 PM
P
PASS
Sunny Ridge phase 2 complete. All temporary BMPS removed, included sediment filter bags. Concrete washout area has been cleaned and hauled away. ESC permit conditions satisfied.
ESC18-00168
Complaint Inspection
4/6/2018
4/6/2018
4/6/2018 2:40:36 PM
P
FAIL
- Sweep up street and sidewalk
- install wattle along the east property line and remove any rock or mud clod close to neighboring property.
Crew arrived to complete sweeping. GC called to state he will keep it clean and have the wattle installed as requested..
ESC17-00687
Site Final
4/6/2018
4/6/2018
4/6/2018 2:28:29 PM
P
NR
BLD finaled. Landscaping/stabilization not yet complete. No sediment leaving site, revegetation bond issued. Will keep permit open for now.
ESC17-01165
Site Final
4/6/2018
4/6/2018
4/6/2018 2:11:59 PM
P
PASS
Home complete, landscaped, and occupied. No ESC corrections
ESC17-00878
Site Final
4/6/2018
4/6/2018
4/6/2018 2:05:30 PM
P
PASS
Home complete, landscaped and occupied. No ESC corrections. All permits finaled.
ESC17-01238
General Inspection
4/6/2018
4/6/2018
4/6/2018 2:02:50 PM
P
PART
No trackout or sediment leaving site. No activity at time of inspection.
No ESC permit sign posted at site. New sign installed on trash box.
Adajacent lot being used for staging and stucco mixing. All debris and material must be cleaned when complete.
ESC17-01434
General Inspection
4/6/2018
4/6/2018
4/6/2018 1:59:29 PM
P
PASS
No trackout or sediment runoff from site. Trash picked up and contained.
No ESC permit posted. New sign placed on trash box.
ESC17-00649
General Inspection
4/6/2018
4/6/2018
4/6/2018 1:34:06 PM
PASS
ESC17-00648
General Inspection
4/6/2018
4/6/2018
4/6/2018 1:33:46 PM
PASS
ESC17-01389
Random Inspection
4/6/2018
4/6/2018
4/6/2018 1:25:31 PM
P
PASS
WIP on placing and compacting fill for building pad. No trackout or discharges from site. Permit posted, perimeter sediment controls installed. Approved.
ESC17-00456
DOC - Permit Finaled
4/6/2018
4/6/2018
4/6/2018 1:08:55 PM
P
PASS
Home complete, landscaped and occupied.
ESC17-00791
Random Inspection
4/6/2018
4/6/2018
4/6/2018 1:06:33 PM
P
PART
Roadway being swept by street sweeper. Permit sign is posted.
Corrections:
- re-install or remove silt fence that is not trenched in. Replace with straw wattle.
ESC18-00109
General Inspection
4/6/2018
4/6/2018
4/6/2018 12:45:45 PM
P
PASS
Graded hillsides have been tracked and hydroseeded. Permit signs posted. Minimal trackout. See also ESC18-00110
ESC18-00110
General Inspection
4/6/2018
4/6/2018
4/6/2018 12:34:54 PM
P
PASS
Graded hillsides have been tracked and hydroseeded. Permit signs posted. Minimal trackout.
ESC17-01749
Tracking Control
4/6/2018
4/6/2018
4/6/2018 12:18:40 PM
P
FAIL
No construction entrance. Trackout and mud on road from site.
Correction request:
- install rock construction entrance
- clean up trackout
ESC17-00392
Site Preparation
4/6/2018
4/6/2018
4/6/2018 12:10:02 PM
P
PART
Road work and muddy parking lot is causing trackout. Crew is in process of installing curb.
RP stated that once curb is in they will provide stabilized access with roadmix. In meanwhile they will scrape/sweep up trackout. Trackout not extending to Warm Springs.
Permit sign posted. Trash is picked up.
ESC17-00842
Conference
4/4/2018
4/6/2018
4/6/2018 11:26:29 AM
A
DONE
10 meeting & walk through
Corrections discussed:
- hydroseeding to occur on Monday
- install earthen berm at top of common drive lots to prevent water from rushing down parellel to road
- divert water flowing over the recently graded slope to vegetated area on the east side of culdesac
- empty out DI bags
- repair section of damaged silt fence on the west side of project
These corrections will occur over next week. RP to notify when in process.
ESC17-00486
Aging Inspection
4/6/2018
4/6/2018
4/6/2018 8:06:54 AM
CANC