ESC16-00168
| General Inspection | 3/30/2016 | 4/7/2016 | 4/7/2016 4:23:04 PM | P | PASS |
|
|
Lining for irrigation ditch diversion channel is installed. The water flowing into the site is already quite turbid, but most like due to the initial flush of the system.
Construction entance preventing trackout, water truck on site for dust suppression.
No corrections requested at this time.
|
ESC15-00808
| Aging Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 3:41:45 PM | | PASS |
|
|
Home complete, landscaped, and occupied. All permits finaled.
|
ESC15-00808
| DOC - Permit Finaled | 4/7/2016 | 4/7/2016 | 4/7/2016 3:41:18 PM | P | PASS |
|
|
|
ESC15-01107
| Aging Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 2:50:35 PM | | PASS |
|
|
Home complete and yard installed. One parcel remaining on culdesac is inactive. No sediment leaving site, no temp BMP removal required. ESC permit conditions satisfied.
|
ESC15-01107
| DOC - Permit Finaled | 4/7/2016 | 4/7/2016 | 4/7/2016 2:50:19 PM | P | PASS |
|
|
|
ESC14-00572
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 2:46:56 PM | | CANC |
|
|
|
ESC15-01408
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 2:43:38 PM | P | PASS |
|
|
WIP on hangar building with support offices. No trackout to Orchard, construction entrance installed. Perimeter BMPs in place in runoff potential locations. No spills or discharges in staging area observed. NO corrections at this time.
See also ESC15-01558 for project
|
ESC15-00812
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 12:17:26 PM | P | PASS |
|
|
WIP on interior and exterior, not yet landscaped. Sediment that was transported to neighbor's driveway has been cleaned up. No discharges or trackout. Seperate pool permit under ESC16-00253.
|
ESC16-00225
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 11:59:55 AM | P | PASS |
|
|
Rough grading and grubbing are in progress. Staging area and construction entrance are in good condition with no trackout. No fugitive dust issues observed. Vegetation around perimeter has been preserved as a buff.
No corrections at this time, permit posted and SWPPP onsite.
|
ESC15-00094
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 11:55:16 AM | | PASS |
|
|
No activity. No SFHs in progress yet. Hillsides have slope interuption and sediment control wattles and areas have been hydroseeded last fall. No erosion issues or sediment runoff occuring. Site in currently in condition. BH #7 is in progress up above the site.
|
ESC15-00065
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 11:49:25 AM | | PASS |
|
|
Home complete and occupied. Yard getting final landscaping. Eroded bank in yard has been raked out and hydroseed applied. Will watching for revegetation and removal of the DI bag on Windsong
|
ESC15-00729
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 11:29:27 AM | | PASS |
|
|
WIP on entrance and utilities on Barber Drive, Syman project manager is onsite installing BMPs. Up top the water line to the tank was installed, the cut slopes are now being hydroseeded. No corrections at this time, will do full ride around next general inspection.
|
ESC15-00035
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 10:19:06 AM | | PASS |
|
|
|
ESC15-00917
| Aging Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 9:44:53 AM | | PASS |
|
|
Home complete. All permits finaled. ESC permit conditions satisfied.
|
ESC15-00917
| DOC - Permit Finaled | 4/7/2016 | 4/7/2016 | 4/7/2016 9:44:28 AM | P | PASS |
|
|
|
ESC15-01072
| General Inspection | 4/7/2016 | 4/7/2016 | 4/7/2016 9:12:30 AM | | PASS |
|
|
Earth Energy no longer on Broadway Bridge project. Extensive work in area as well as staging. Utility bores are complete. Will continue to monitor area (permitted through ITD) through construction.
|
ESC15-01072
| DOC - Permit Finaled | 4/7/2016 | 4/7/2016 | 4/7/2016 9:11:33 AM | P | PASS |
|
|
|