Inspections for the day of: Friday, April 7, 2017.
Number of inspections: 30
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01004 General Inspection4/6/20174/7/20174/13/2017 7:54:47 AMPPEND
Need to have them clean up gutters within staging lanes on Capitol and Myrtle
ESC17-00114 General Inspection4/5/20174/7/20174/11/2017 7:32:52 AMACANC
ESC16-00697 Random Inspection4/7/20174/7/20174/7/2017 4:49:59 PMPFAIL
Uncontained paint and other material washout on corner of Ardyce and Fastwater

Correction request to clean up and train painters to use a designated washout area.
ESC17-00294 Site Preparation4/7/20174/7/20174/7/2017 4:47:19 PMPPASS
Tracy Phone #: ###-####

Approved for construction. Need to install inlet protection on Coolwater.
ESC17-00295 Site Preparation4/7/20174/7/20174/7/2017 4:47:00 PMPPASS
Tracy Phone #: ###-####

Approved for construction. Need to install inlet protection on Coolwater
ESC17-00297 Site Preparation4/7/20174/7/20174/7/2017 4:46:43 PMPPASS
Tracy Phone #: ###-####

Approved for construction. Need to install inlet protection on Coolwater
ESC16-00319 General Inspection4/7/20174/7/20174/7/2017 4:10:22 PM PEND
Need to removed silt fences that are no longer trenched ...BLD finaled, home is occupied and yard is vegetating. Will work with builder and home owner to resolve
ESC17-00044 General Inspection4/7/20174/7/20174/7/2017 4:09:13 PMPFAIL
Dirt stockpiled on sidewalk since excavation. Trackout, dirty street. No housekeeping. Will re-inspect Monday to get homes on Hacienda completed.
ESC16-00053 Aging Inspection4/7/20174/7/20174/7/2017 4:07:59 PM PASS
Home complete and landscaped. Subdivision BMPs to remain while remaining Belmar phase I homes are completed
ESC16-00053 DOC - Permit Finaled4/7/20174/7/20174/7/2017 4:05:14 PMPPASS
ESC17-00265 Site Preparation4/6/20174/7/20174/7/2017 4:04:45 PMAPEND
Andrina Phone #: ###-####

Approved to start. Subdivsion BMPs installed. Need to get developer and Wood Bros to provide concrete washout
ESC16-00955 General Inspection4/5/20174/7/20174/7/2017 3:50:07 PMPPEND
follow up. No trackout. No new corrections. Will meet RP next week to discuss perimeter sediment control installation.
ESC17-00366 General Inspection4/7/20174/7/20174/7/2017 3:09:09 PMPPASS
WIP on demolition. NO trackout or fugitive dust observed
ESC15-01050 General Inspection4/7/20174/7/20174/7/2017 3:08:39 PM CANC
rescheduled
ESC17-00198 Site Preparation4/7/20174/7/20174/7/2017 3:08:08 PMPPASS
Dave Phone #: ###-####

Subdivision BMPs installed. Approved to start. Will re-inspect Monday for corrections related to phase 8 & 9 Eyrie Canyon.
ESC04-00542 DOC - Permit Finaled4/7/20174/7/20174/7/2017 2:49:57 PMPPASS
old expired permit removed from database
ESC04-01105 DOC - Permit Finaled4/7/20174/7/20174/7/2017 2:49:24 PMPPASS
old expired permit removed from database
ESC16-01072 General Inspection4/7/20174/7/20174/7/2017 2:44:11 PMPPASS
Duplex project near completion. Landscaping completed and open areas have recently been hydroseeded. No violations observed, will monitor growth of grass
ESC16-01720 General Inspection4/4/20174/7/20174/7/2017 1:52:11 PMPPASS
check for corrections (sign, DI protection modification)

Curb cuts to storm drains have been fitted with sandbags to prevent water bypassing the filter fabric sediment protection. Approved.
ESC16-00532 Site Final4/6/20174/7/20174/7/2017 1:13:42 PMPNR
WIP. Not yet complete. Final landscaping and sweeping required. No discharges. No MS4 system in area.
ESC16-00062 Site Final4/6/20174/7/20174/7/2017 1:12:22 PMPPASS
Home complete and disturbed area stabilized; all permits finaled. No ESC corrections needed.
ESC16-01515 General Inspection4/7/20174/7/20174/7/2017 10:16:41 AMAPART
Trackout has been swept. Trash around sites cleaned up. Duplexes near completion.

Need to clean up loose dirt around sediment filter mats and provide more visible location of concrete washout for next round of homes. Next set of homes must have Site Preparation inspections.
ESC16-00276 General Inspection4/5/20174/7/20174/7/2017 10:13:16 AMAPASS
Subdivision work complete. Common areas vegetated. SFHs now in progress on Tahiti Street. ESC permits now with Wood Bros. for Eagle Energy Concepts. No futher ESC inspections on this permit.
ESC16-00276 DOC - Permit Finaled4/7/20174/7/20174/7/2017 10:11:59 AMPPASS
ESC16-01267 General Inspection4/7/20174/7/20174/7/2017 10:10:31 AMPPASS
Monument sign installed. Base of sign has been landscaped/stabilized. Permit finaled.
ESC16-01267 DOC - Permit Finaled4/7/20174/7/20174/7/2017 10:02:15 AMPPASS
ESC16-00096 General Inspection4/7/20174/7/20174/7/2017 10:01:53 AMAPASS
WIP on interior demolition & remodel. Selective demolition of curbing of previous use. Wattles installed around disturbed areas. No trackout or discharges. Dandy bag check dam placed in gutter since storm to capture sediment. Permit sign is posted.
ESC17-00089 Site Final4/7/20174/7/20174/7/2017 9:51:20 AMPNR
Building has been demolished but lot has not been stabilized. WIP by Knife River on Fairview & Cole intersection. Will keep permit open to monitor area. MS4 has inlet protection.
ESC16-01437 General Inspection4/7/20174/7/20174/7/2017 9:31:30 AMPPASS
Building demolished. MS4 inlets have sediment protection. No trackout or sediment runoff observed. Permit sign posted. Need to check on stabilization or perimeter sediment controls next inspection.
ESC15-01487 General Inspection4/7/20174/7/20174/7/2017 9:28:21 AM PASS
Landscaping in progress at west end of parking lot. Swale on east side of building has been hydro-mulched but grass is not yet growing. MS4 on Fairview still has sediment bag installed. Need to remove temporary BMPs after landscaping/re-vegetation is complete. BLD already finaled. NO sediment or other materials leaving site.