ESC13-01323
| Site Final | 4/1/2016 | 4/8/2016 | 4/11/2016 10:45:18 AM | A | PEND |
|
|
Tyler from Andersen stated that silt fence and DI bags will be removed at Cantabria, allowing all ESC permits associated with project to be finaled.
DI bags still not removed as discussed. Tyler with Andersen notified BLD status will not be changed from Temp. Occupancy until bags are removed.
If not done for the next site final requested, will charge re-inspection fee.
|
ESC15-01533
| General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 3:26:47 PM | P | PASS |
|
|
WIP. Silt fence installed to protect ditch on north side or property. Permit sign posted on porch. No trackout or other issues observed. Approved
|
ESC15-00744
| DOC - Permit Finaled | 4/8/2016 | 4/8/2016 | 4/8/2016 3:14:12 PM | P | PASS |
|
|
Work complete. No disturbed area or construction materials remaining on site. BLD passed final inspection but still says issued...
|
ESC15-00871
| Site Preparation | 4/5/2016 | 4/8/2016 | 4/8/2016 3:11:38 PM | P | PASS |
|
|
Note - not a site prep,construction already in progress.
Street was swept, no discharges, no fugitive dust. Will need to stabilize the canal bank
|
ESC15-01114
| Aging Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 2:24:34 PM | | PASS |
|
|
Townhome complete and landscaped. ESC permit conditions satisfied. Temp BMPs in Mill District Square to be removed once units on Woodcutter are complete
|
ESC15-01114
| DOC - Permit Finaled | 4/8/2016 | 4/8/2016 | 4/8/2016 2:17:23 PM | P | PASS |
|
|
|
ESC15-01224
| General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 2:06:11 PM | P | PASS |
|
|
WIP on Library! No trackout, no significant changes to SWPPP managemnt. Construction entrance and concrete washout area are installed. No corrections issued.
|
ESC15-00403
| General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 2:02:09 PM | | PASS |
|
|
No trackout or sediment/debris leaving site. No activity at time of inspection. No violations.
|
ESC16-00195
| Site Final | 4/8/2016 | 4/8/2016 | 4/8/2016 2:01:01 PM | P | PASS |
|
|
Commercial demolition complete. All materials hauled away and building footprint stabilized with asphalt for surface parking. ESC conditions satisfied. DI had mat installed prior to project start and is not interupt stormwater flow.
|
ESC15-01054
| Aging Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 12:05:57 PM | | PASS |
|
|
Home complete. Needs final landscaping. Subdivision BMPs installed.
|
ESC15-01053
| Aging Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 11:56:04 AM | | PASS |
|
|
|
ESC14-00886
| General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 11:15:12 AM | | PASS |
|
|
WIP on interior and exterior finishes. Structure is framed and built out, no excavation occuring. No trackout or discharges; permit posted inside fence.
|
ESC11-00879
| General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 9:53:35 AM | | PASS |
|
|
WIP on SFH on Painted Feather. Trash contained, DIs have sediment filter bags installed, and open parcel have a perimter sediment controls. Subdivision near completion, 3-4 lots remaining.
|
ESC15-00731
| General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 9:52:08 AM | | PASS |
|
|
|
ESC13-00806
| General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 9:05:59 AM | | PASS |
|
|
|