ESC14-00488
| General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 4:17:45 PM | | PASS |
|
|
|
ESC14-00671
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 2:48:15 PM | P | PASS |
|
|
Lusk Place retaining wall is constructed. No further ESC inspections on this permit. See main site permit ESC14-00212 for inpsection activity. Site currently in compliance.
|
ESC14-01035
| General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 2:43:04 PM | | PASS |
|
|
WIP on frame. Sidewalk and gutters are free of loose sediment accumulations. RP/GC to repair drainage area below house to pre-existing conditions with native vegetation. No corrections issued.
|
ESC15-00200
| Site Preparation | 5/1/2015 | 5/1/2015 | 5/1/2015 1:29:49 PM | P | PASS |
|
|
Initial site prep was conducted for the demolition of the old building. CM company requested second site prep because they are starting now on the Primary Health Clinic.
Permiter wattles installed. Concrete washout "eco-pans" are onsite and being utilized. MS4 DIs on Overland and Orchard have inlet protection. Approved
|
ESC14-00859
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 1:06:28 PM | P | PASS |
|
|
This phase of St. Lukes MSTI vault expansion and accelerator TI has been finaled. ESC inspections of project to be covered under ESC14-01105 & 06. No violations at site. BMPs included trash and material containment, concrete washout bin, and inlet protection.
|
ESC14-01105
| Random Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 1:04:07 PM | P | PASS |
|
|
WIP on basement & vault expansion at St. Luke's MSTI. No No trackout or discharges. Initial site prep, grading, and excavation under ESC14-00859 is now finaled. Project covered under this permit and ESC14-01106 (first floor TI-expansion)
|
ESC13-01026
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 12:37:38 PM | P | PASS |
|
|
Landscaped, stabilized, and site cleaned. Only 2 more parcels along Old Hickory and then will request DI bags to be removed.
ESC conditions satisfied.
|
ESC14-00627
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 12:35:31 PM | P | PASS |
|
|
Home complete, landscaped, and occupied. ESC permit conditions satisfied.
|
ESC14-00989
| General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 12:29:21 PM | | PASS |
|
|
No activity or changes at site since last inspection. Site BMPs keeping sediment on site. No trackout or issues. Minor site work indicates construction will begin soon.
|
ESC13-01279
| General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 12:15:02 PM | | PASS |
|
|
15 homes are near completion at Lucky Harris/Harris Crossing. Lined concrete washout facility has been well maintained and utilized. RP Chad informed that Ground FX will be handling ESC issues for Hunter Homes, as well as Hunter Homes SFH RP Ausitn.
Trash is contained, no trackout or discharges. Perimeter BMPs and inlet protection in good condition. Disturbed area at sound of site has been hydroseed for stabilization.
Approved.
|
ESC14-01083
| General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 11:48:43 AM | P | PASS |
|
|
Barber Valley townhomes (aka Park Place aka Marian Williams Park TH) Roads and curbs complete on first phase and all utilities for all 3 phase are complete. Security fence has been removed. No further dewatering to occur.
New phase/ESC site map update has been included in the SWPPP binder per RP Danial with Brighton Corp.
BMPs installed, no discharges, fugitive dust or other issues. Permit posted.
No active cement work currently, but washouts available for this project and sidewalk project.
|
ESC14-01025
| General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 11:24:01 AM | A | PASS |
|
|
Workers in process of pouring the new sidewalks from Marianne Williams Park to Parkcenter Blvd.
No discharges or runoff off to stormdrains. 5 concrete washouts bins are being utilized, 3 of which are full. May need service to contain remaining work to be done.
A-core working on curb cutting. Will need to have sweeper pick up concrete dust and prevent slurry runoff to DIs.
|
ESC14-00746
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 10:23:18 AM | P | PASS |
|
|
|
ESC14-00746
| General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 10:22:41 AM | | PASS |
|
|
Greenhouse is built. Site improvements around greenhouse are still in progress. No sediment runoff or trackout. See also ESC14-00747. Going to close this permit to avoid duplication. No violations at site.
|
ESC13-01339
| Aging Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 8:59:04 AM | | PASS |
|
|
WIP at Cantabria. Framing occuring. Units on the west end are starting to be painted. No trackout or discharges.
ESC inspections to continue under ESC13-01323 (see for details) ; this permit finaled.
|
ESC13-01339
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 8:58:53 AM | P | PASS |
|
|
|
ESC13-01338
| Aging Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 8:58:45 AM | | PASS |
|
|
WIP at Cantabria. Framing occuring. Units on the west end are starting to be painted. No trackout or discharges.
ESC inspections to continue under ESC13-01323 (see for details) ; this permit finaled.
|
ESC13-01338
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 8:58:36 AM | P | PASS |
|
|
|
ESC13-01336
| Aging Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 8:46:49 AM | | PASS |
|
|
WIP at Cantabria. Framing occuring. Units on the west end are starting to be painted. No trackout or discharges.
ESC inspections to continue under ESC13-01323 (see for details) ; this permit finaled.
|
ESC13-01336
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 8:46:36 AM | P | PASS |
|
|
|
ESC13-01335
| Aging Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 8:46:29 AM | | PASS |
|
|
WIP at Cantabria. Framing occuring. Units on the west end are starting to be painted. No trackout or discharges.
ESC inspections to continue under ESC13-01323 (see for details) ; this permit finaled.
|
ESC13-01335
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 8:46:14 AM | P | PASS |
|
|
|
ESC13-01334
| DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 8:45:43 AM | P | PASS |
|
|
|
ESC13-01334
| Aging Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 8:45:23 AM | | PASS |
|
|
WIP at Cantabria. Framing occuring. Units on the west end are starting to be painted. No trackout or discharges.
ESC inspections to continue under ESC13-01323 (see for details) ; this permit finaled.
|