Inspections for the day of: Monday, May 1, 2017.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00018 General Inspection5/1/20175/1/20175/3/2017 8:10:50 AMPPEND
Inspection 5/1 PM

De-watering into stormwater pond from excavation wellpoints. Hi-grade and Sunroc crews onsite. Stormwater pond is being dewatered with water flowing through hose west of Warm Springs Creek and into drainage basin with ditch that flows towards Walling Creek.

Eckert Road is not yet paved and a new ditch to transport Council Springs has been dug. There is no ditch lining or check dams. Water appeared muddy and flows into a grassy wetland area adjacent from River. No plume visible in river. Silt fence installed to slow water entering the meadow area - unable to see if there is any effective treatment.

RP is going to have crews install check dams of washed rock. Will inspect to review BMP options.
ESC13-01279 General Inspection5/1/20175/1/20175/1/2017 5:05:11 PM PASS
ESC15-01288 General Inspection5/1/20175/1/20175/1/2017 4:08:36 PMPPART
WIP of SFHs. Landscaping crew installing river rock on top of erosion control matting in drainage channel. No trackout or fugitive dust issues. Streets on a sweeping schedule an.

Correction:
- need to have concrete washout container serviced, near overflowing conditions.
ESC14-00657 General Inspection5/1/20175/1/20175/1/2017 3:54:08 PMPPEND
Need to remove all temporary BMPs from storm drains in pahse #6. All lots have landscaped homes, all common areas stabilized.
ESC15-01431 Aging Inspection5/1/20175/1/20175/1/2017 3:46:23 PM PASS
Home complete, landscaped and occupied. No ESC corrections.
ESC15-01431 DOC - Permit Finaled5/1/20175/1/20175/1/2017 3:45:58 PMPPASS
ESC14-00206 General Inspection5/1/20175/1/20175/1/2017 3:23:08 PM PEND
Sunnyridge phase 3 is complete and all homes have been built. Permit open for clean up of old concrete washout waste and debris on Bear Ridge. Located in future are for phase 4. No trackout or discharges from site, subdivision retains all storm water
ESC17-00404 Site Preparation5/1/20175/1/20175/1/2017 2:57:20 PMPPASS
WIP on underground utilities. This week new water and sewer line will be cut into road. Road will be repaved after words.

Permit sign posted at end of street. Two MS4 inlets on Elder have had sediment bags installed. Construction entrance installed, minimal trackout. Water truck onsite for fugitve dust control. RP Bob on duty.

Approved.
ESC15-00434 General Inspection5/1/20175/1/20175/1/2017 2:36:08 PM CANC
ESC16-00448 Conference5/1/20175/1/20175/1/2017 2:35:54 PMPDONE
Review of site final conditions with RP and site walk through at new Fire Station.

Site is fully landscaped and exterior complete. Dumpster is to be hauled away this week and street sweeing on Friday. Temp DI filter mat to be removed. Ribbon cutting ceremony next week. Site Final scheduled 5/11.
ESC16-01582 General Inspection5/1/20175/1/20175/1/2017 12:24:27 PMPPASS
BMPs installed. Still need to regrade lots and remove stockpile. No trackout, fugitive dust, or other issues observed. Permit and SWPPP posted.
ESC15-00731 General Inspection5/1/20175/1/20175/1/2017 12:15:04 PM CANC
ESC15-01521 Aging Inspection5/1/20175/1/20175/1/2017 12:05:51 PM PEND
demoliton of SFH complete, but disturbed area and stockpiles are not stabilized. No new SFH permits received yet. No trackout or muddy runoff from site. Tractor still parked on lot.
ESC16-00208 General Inspection5/1/20175/1/20175/1/2017 12:02:00 PM PASS
ESC15-00976 General Inspection5/1/20175/1/20175/1/2017 10:13:19 AM PASS
No activity at time of inspection. No discharges, uncontained trash or other issues. Site is clean and new townhomes have been landscaped.
ESC15-01258 Aging Inspection5/1/20175/1/20175/1/2017 9:17:12 AM PASS