ESC18-00374
| Site Final | 5/1/2019 | 5/1/2019 | 5/2/2019 2:36:08 PM | P | PASS |
|
|
BLD open but work complete. No further ESC inspections required.
|
ESC18-00429
| General Inspection | 5/1/2019 | 5/1/2019 | 5/2/2019 2:15:07 PM | | PASS |
|
|
No trackout or offsite discharges. Irrigation line failure washed top soil off recently landscaped area. They will need to pump out dirt from receiving storm drain sump, which Curt with Russel Corp said is their plan after mess is cleaned up. No other issues, RP on duty
|
ESC18-00075
| General Inspection | 5/1/2019 | 5/1/2019 | 5/2/2019 2:13:27 PM | | PASS |
|
|
ESC permit finaled. BMPs to remain for ongoing construction at North Hill. See also ESC15-00853.
|
ESC18-00847
| General Inspection | 5/1/2019 | 5/1/2019 | 5/1/2019 3:18:51 PM | | PEND |
|
|
Home exterior complete, but slopes around home are not yet landscaped or vegetated. Temporary perimeter controls installed
|
ESC18-01235
| General Inspection | 5/1/2019 | 5/1/2019 | 5/1/2019 1:58:13 PM | P | FAIL |
|
|
Corrections needed: - clean up full trash bins, wind is starting to blow stuff around site and surrounding area - provide new concrete washout capacity for up coming concrete work - sweep sidewalk and replace damaged gravel bags - make plan for large stockpile removal and/or stabilization
Verbal Correction request to RP Gary via vm. Posted new ESC permit sign for the site.
|
ESC19-00371
| Site Preparation | 5/1/2019 | 5/1/2019 | 5/1/2019 12:08:05 PM | A | DONE |
|
|
10 AM pre-con meeting
|
ESC18-00374
| Aging Inspection | 5/1/2019 | 5/1/2019 | 5/1/2019 8:11:02 AM | | CANC |
|
|
|