ESC16-00935
| General Inspection | 4/27/2020 | 4/27/2020 | | | |
|
|
|
ESC16-01457
| General Inspection | 5/1/2020 | 5/1/2020 | 5/8/2020 2:21:41 PM | | CANC |
|
|
|
ESC18-00164
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 4:10:32 PM | P | PASS |
|
|
No BMP failures, significant erosion, or other problems occured after storm 4/30.
Need to finish revegetation ASAP before it gets too hot and dry. Follow up scheduled to discuss with RP
|
ESC18-00983
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 4:09:06 PM | P | PASS |
|
|
Minimal activity. No violations, erosion issues observed. BMPs installed, revegetation working well to prevent erosion
|
ESC19-00324
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 4:08:28 PM | P | PASS |
|
|
No siginificant runoff issues or erosion on site from thunderstorm.
Follow up scheduled to discuss revegetation of some upper areas of the subidvsion that are still bare.
|
ESC19-00371
| General Inspection | 4/30/2020 | 5/1/2020 | 5/1/2020 3:55:40 PM | P | PEND |
|
|
Onsite meeting at 9:30 AM to discuss corrective actions after discharge of muddy stormwater due to signifcant rainfall and BMP failures ( inadequate outlet protection on new stormwater system features at Vortex/Ridgepoint pond and outfall at bottom of site, plugged/misconnected stormwater bypass pipe)
Corrective active plan: - all work Friday and Saturday is focused on repair and preparing system to be properly operational - repair/complete the new stormwater discharge pipe into pond so no erosion occurs when flowing into pond - build lined & rip rapped spillway upstream from new DIs on Ridgpoint to prevent overflow from gutter over disturbed ground to pond
- add additonal lining to hold down sediment and perimter sediment controls around the Ridgepoint/Vortex pond to ensure no flows from disturbed areas around pond so all water going in is treated by a sediment control
- Plug outlet pipe from the pond ASAP to create a no discharge situation till system can be properly completed; will be plugged until system completion (monday-tuesday 5/4-5/5). Will need to be onsite if rain storm occurs (none currently forecasted) to make sure pond does not overflow - repair broken manholes and make connections per plan. Verify correct connection once complete - Install outlet protection (energy dissipators, scour prevention, rip rap, flow spreader etc) at bottom of site - clean out any accumulated mud in the stormwater drainage system and below the site discharge. Remove mud on cement flume passing by JH storage lot - take turbidity measurements and plan for turbidity testing of stormwater discharges after all 0.25 rain events until further notice. keep log in SWPPP - complete corrective action report for SWPPP, share link to Syman website for the site's SWPPP with Boise ESC Inspectors for review
Follow up scheduled for Monday 5/4
Turbidity testing conducted: - 9:10 ACHD stormwater basin at bottom of Starcrest prior to discharge to Boise River tributaries 44.7 NTU - 9:15 Boise River tributary channel approx 1/3 mile downstream 37.2 NTU - 9:40 Water pooled in Vortex/Ridgepoint pond 647 NTU - 10:00 Bypass outlet pipe 968 - 10:05 down stream from outlet pipe in creek before flow into culver to flume 793 NTU - note: estimate Boise River is no more than 5 NTU. This is an exceedence of water quality limits
Note: upper subdivsion is in compliance. No trackout, consturction entrance installed, concrete washout pan, bermed lotsf for stormwater control, revegetation looks really good
follow up scheduled for Monday
|
ESC18-01608
| Aging Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 3:18:23 PM | | CANC |
|
|
rescheduled for site final
|
ESC19-00145
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 3:17:31 PM | | CANC |
|
|
|
ESC19-00880
| Aging Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 3:15:55 PM | | CANC |
|
|
rescheduled for site final
|
ESC19-00905
| Aging Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 3:15:17 PM | | CANC |
|
|
rescheduled for site final
|
ESC19-00709
| Aging Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 3:14:27 PM | | CANC |
|
|
rescheduled for site final
|
ESC19-00560
| Aging Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 3:13:49 PM | | CANC |
|
|
|
ESC19-00560
| DOC - Permit Finaled | 5/1/2020 | 5/1/2020 | 5/1/2020 3:13:38 PM | P | PASS |
|
|
|
ESC18-01255
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 3:12:34 PM | | PASS |
|
|
|