Inspections for the day of: Wednesday, May 10, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00434 General Inspection5/10/20175/10/20175/10/2017 4:09:08 PM CANC
ESC15-00857 General Inspection5/10/20175/10/20175/10/2017 11:51:37 AMAPASS
Inspection conducted on 5/9 PM. No new subdivision activity within Eyrie Canyon #9 limits. Hillside areas not on graded parcels have revegetated well.

Trackout from #9 to phase #8 has been cleaned regularly. The drainage channels on either side of Arrow Villa have had maintenance conducted on the wattle check dams and an earten berm has been installed below lots on corner of Winter Camp and Eyrie that is acting as a sediment trap. There is some erosion evident on these lots.

Storm drain inlets are protected with fiber mats.

Mudslide from graded lot down to home on Arrow Villa has started to revegetate naturally. Sod in backyard has been replaced. Will check with PW HIllside for further slope repairs that may be required, the drainage issue on the lot in question has been temporary mitigated.

Note: rill and gully erosion is occuring on the lot on Winter Camp and slope below. Recieving area is owned by developer. Slope will need repair and erosion controls installed to satisfy final ESC permit conditions.

No immediate corrections requested.
ESC15-00857 Site Preparation5/10/20175/10/20175/10/2017 11:51:09 AMACANC
data entry error, not a site prep inspection
ESC16-00793 Aging Inspection5/10/20175/10/20175/10/2017 11:24:15 AM PASS
ESC16-00812 Aging Inspection5/10/20175/10/20175/10/2017 8:34:59 AM PASS
ESC15-00094 General Inspection5/10/20175/10/20175/10/2017 8:06:13 AM CANC
ESC16-00761 Aging Inspection5/10/20175/10/20175/10/2017 8:04:42 AM PASS
ESC16-00761 DOC - Permit Finaled5/10/20175/10/20175/10/2017 8:04:35 AMPPASS
ESC16-00938 General Inspection5/10/20175/10/20175/10/2017 7:45:09 AM PEND
revegetation phase; construction complete