ESC15-00871
| General Inspection | 5/11/2016 | 5/11/2016 | 5/13/2016 3:06:27 PM | | CANC |
|
|
rescheduled for Monday
|
ESC15-00731
| General Inspection | 5/11/2016 | 5/11/2016 | 5/12/2016 2:29:27 PM | | PASS |
|
|
|
ESC16-00341
| General Inspection | 5/9/2016 | 5/11/2016 | 5/11/2016 3:53:28 PM | P | PART |
|
|
follow up on CN
Site is still active backfilling foundation and moving dirt around with Bobcat. Will need to clean up sidewalk and gutter thoroughly this week prior to framing work.
|
ESC16-00215
| General Inspection | 5/9/2016 | 5/11/2016 | 5/11/2016 3:52:09 PM | P | PASS |
|
|
follow up inspection
Sediment and mud that was transported off north end of site has been cleaned up as requested. No new violations. Site back in compliance currently.
|
ESC15-00957
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 3:22:22 PM | | PASS |
|
|
Belmar SFHs in progress by Z. Evans Construction and Tahoe Homes that are permitted seperately. Sites are clean, no trackout or discharges outside of subdivision. Trash containers and designated concrete washout provided.
|
ESC15-00882
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 3:22:04 PM | | PASS |
|
|
|
ESC15-00976
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 3:00:46 PM | | PASS |
|
|
No activity. No issues at site. Perimeter wattles and DI bags installed around site for townhome construction yet to be started.
|
ESC15-01180
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 2:49:04 PM | | PASS |
|
|
Home complete, landscaped, and stabilized. Already occupired. DI bag out front has been removed. ESC permit conditions satisified.
|
ESC15-01180
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 2:48:54 PM | P | PASS |
|
|
|
ESC15-00729
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 2:20:04 PM | | PASS |
|
|
WIP on road improvements at entrance to HRN and Barber Drive. No trackout or fugitive dust leaving work area.
Notified by Hunter Homes that work on water tank at top of sub has been started and is covered under seperate permit (ESC16-00144)
No ESC violations observed. Hillside vegetation is still growing well with no recent erosion issues.
|
ESC15-01270
| Site Final | 5/9/2016 | 5/11/2016 | 5/11/2016 2:12:57 PM | P | NR |
|
|
Landscaping and utility/irrigation line work associated with parking lot expansion is still in progress. Disturbed area and materials still onsite. No sediment runoff, discharges, or trackout. Will check back in 2 weeks.
|
ESC15-01579
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 1:54:08 PM | P | PASS |
|
|
WIP on installing stormwater retention pit underground. No pumping of groundwater has been observed at time of inspection and surface water has now re-infiltrated into the ground.
Sediment bags were changed out as requested and rock construction entrance installed. No discharges from site and perimeter has been cleaned of all mud. Grass seems to recovered well from the dewatering operation, will check with Parks n Rec to see if their conditions were satisfied.
No corrections issued at this time, WIP.
|
ESC15-00947
| Aging Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 1:35:32 PM | | PASS |
|
|
Detached accessory building in backyard is complete and within vegetated garden area. No construction or loose sediment leaving site. ESC conditions satisfied.
|
ESC15-00947
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 1:34:25 PM | P | PASS |
|
|
|
ESC15-01061
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 1:16:20 PM | | PASS |
|
|
WIP. Silt fence perimeter and DI sediment filter bag are in good condition. No windblown trash leaving property, no trackout, permit sign posted. No corrections requested.
|
ESC16-00258
| Site Final | 5/11/2016 | 5/11/2016 | 5/11/2016 12:17:19 PM | P | PASS |
|
|
Greenbelt path is complete. Staging area cleaned up and no materials remaining on site. Sides of path have been re-sodded. Path open to public. ESC permit conditions satisified.
|
ESC14-00588
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 11:58:10 AM | P | PASS |
|
|
Notified by RP that new construction entrance has been installed to accomodate trucks entering from east Parkcenter. Rock is heavy duty 3-4 inch angular.
No trackout from site, street and gutter has been swept last week. BMPs of concrete washout bin, designated waste management areas, and lined irrigation channel are in good condition.
Approval has been granted by irrigation district to the project owners to re-routing outflow of lateral to not cross private property of the existing home and stabilize the area to prevent future bank erosion or neighbor conflict. Discharge of the irrigation water is clear in Loggers Creek, bank is stable.
|
ESC15-01184
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 11:08:20 AM | | PASS |
|
|
BMPs installed and being maintained regularly. Including rock construction entrances, DI protection, and street sweeping. No trackout, discharges, or fugitve dust.
|
ESC16-00318
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 11:06:31 AM | P | PASS |
|
|
House demolition and material removal complete. Area now being utilized as parking area. No ESC issues.
|
ESC15-01491
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:56:10 AM | P | PASS |
|
|
Exterior ramps, patios and site improvements. No temp BMPs remaining, no loose sediment or disturbed area. All permits finaled.
|
ESC16-00423
| Random Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 10:50:03 AM | P | PASS |
|
|
WIP on demolition. No fugitive dust, trackout, or complainst received. Seperate permit is issued for new SFH construction once demo is complete.
|
ESC04-01239
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:48:58 AM | P | PASS |
|
|
old expired permit in system
|
ESC04-01232
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:48:49 AM | P | PASS |
|
|
old expired permit in system
|
ESC04-00992
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:48:27 AM | P | PASS |
|
|
old expired permit in system
|
ESC04-01165
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:48:18 AM | P | PASS |
|
|
old expired permit in system
|
ESC03-01378
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:48:05 AM | P | PASS |
|
|
old expired permit in system
|
ESC04-00334
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:47:49 AM | P | PASS |
|
|
old expired permit in system
|
ESC15-01095
| Aging Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 10:44:53 AM | | PASS |
|
|
No construction or earth disturbance at site. No activity on BLD permit in over 6 months. Permit expired. No issues
|
ESC15-01095
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:44:07 AM | P | PASS |
|
|
|
ESC15-00623
| Random Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 10:19:40 AM | P | PART |
|
|
Home structure is complete but yard and driveway are not yet installed. Workers building landscape retaining wall on front slope. No significant trackout, perimeter wattle is installed around site, and most of the front slope is not disturbed.
Corrections needed: - DI bags next to driveway exit are full and need to be changed. - Need to clean up minor blowout at the low corner of the lot and re-install wattle. - Connect roof drains if not all ready or install slope drain. May consider a hydromulch/tacifier on the area where erosion is occurning.
|
ESC15-01435
| General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 10:14:41 AM | P | PASS |
|
|
WIP, near completion. No trackout or discharges. Perimeter wattles installed. No slope disturbance or erosion observed.
|
ESC14-00572
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 10:12:46 AM | P | PASS |
|
|
HIllside does not have any significant signs of instability or erosion rills. Vegetation consists of grass and volunteer weeds. Wattles are still in place. Very near 80% vegetation coverage
|
ESC15-01119
| Aging Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 9:15:54 AM | | PASS |
|
|
|
ESC14-00602
| Aging Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 8:46:32 AM | | PASS |
|
|
Main project inspected at least every two weeks under ESC14-00588. Earthwork/building footprint for this structure is complete. No further inspections on this permit.
|
ESC14-00600
| Aging Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 8:46:15 AM | | PASS |
|
|
Main project inspected at least every two weeks under ESC14-00588. Earthwork/building footprint for this structure is complete. No further inspections on this permit.
|
ESC14-00600
| DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 8:46:07 AM | P | PASS |
|
|
|