Inspections for the day of: Friday, May 13, 2016.
Number of inspections: 28
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00789 General Inspection5/13/20165/13/20165/13/2016 4:43:08 PM PASS
see also ESC15-01184. No sediment or runoff from site. BMPs installed.
ESC15-01164 Aging Inspection5/13/20165/13/20165/13/2016 3:30:18 PM CANC
project complete, no outstanding ESC issues. Permit closed.
ESC15-01164 DOC - Permit Finaled5/13/20165/13/20165/13/2016 3:29:45 PMPPASS
ESC15-01074 DOC - Permit Finaled5/13/20165/13/20165/13/2016 3:01:12 PMPPASS
ESC15-01172 Aging Inspection5/13/20165/13/20165/13/2016 2:44:48 PM PASS
WIP on frame. No violations. Approved.
ESC15-00586 General Inspection5/13/20165/13/20165/13/2016 2:12:47 PM CANC
ESC16-00225 Complaint Inspection5/13/20165/13/20165/13/2016 2:01:47 PMPPEND
Complaint regarding grading limits:

- Developer working in future area of stormwater retention pond for BH #7
- approximately 1 acre of disturbance, permitted for 8.5 acres with Boise.
- water truck onsite for dust control as needed. No significant dust existing project area
- No BMP failures observed. Construction entrance and sediment controls working well. Site inspection form are located in SWPPP box and up to date
- Sediment control BMPs installed at bottom of new excavated area in question


Investigating if this 1 acre is part of the 8.5 for project.

Correction request:

- update site map in SWPPP folder and show BMPs installed.
ESC15-01263 Aging Inspection5/13/20165/13/20165/13/2016 12:37:50 PM DONE
No activity at site. No issues. No inspector activity logged on BLD permit, which is soon to expire.
ESC15-01288 General Inspection5/13/20165/13/20165/13/2016 11:56:19 AMPPASS
WIP on utility and road installation at RH #7. Permit sign and SWPPP information is posted, construction is installed and no trackout. No discharges on or offsite, no fugitive dust at time of inspection and no complaints received.

No corrections issued, approved.
ESC15-00556 General Inspection5/13/20165/13/20165/13/2016 11:53:21 AM PASS
No new subdivision activity at East Valley phase 2-3. No fugitive wind blown dust observed, no recent complaints received. No trackout or discharges. SFHs in active phases are in compliance.
ESC15-01350 DOC - Permit Finaled5/13/20165/13/20165/13/2016 11:52:09 AMPPASS
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
ESC15-01348 DOC - Permit Finaled5/13/20165/13/20165/13/2016 11:52:01 AMPPASS
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
ESC15-01344 DOC - Permit Finaled5/13/20165/13/20165/13/2016 11:51:52 AMPPASS
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
ESC15-01342 DOC - Permit Finaled5/13/20165/13/20165/13/2016 11:48:56 AMPPASS
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
ESC15-00873 DOC - Permit Finaled5/13/20165/13/20165/13/2016 11:31:39 AMPPASS
Construction complete. All permits finaled. No ESC corrections/actions needed.
ESC15-00872 DOC - Permit Finaled5/13/20165/13/20165/13/2016 11:28:21 AMPPASS
East Valley home now landscaped and stabiilzed. All permits finaled. ESC condtions satisfied. Tahoe Homes to remove sediment bags after all SFHs & phases complete3
ESC16-00092 Site Preparation5/12/20165/13/20165/13/2016 11:14:11 AMAPASS
Inspection requested via web by Kyle Buzzell


Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
ESC16-00150 Site Preparation5/12/20165/13/20165/13/2016 11:13:45 AMAPASS
Inspection requested via web by Kyle Buzzell


Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
ESC16-00152 Site Preparation5/12/20165/13/20165/13/2016 11:13:20 AMAPASS
Inspection requested via web by Kyle Buzzell


Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
ESC16-00148 Site Preparation5/12/20165/13/20165/13/2016 11:12:46 AMAPASS
Inspection requested via web by Kyle Buzzell

Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
ESC13-00193 General Inspection5/13/20165/13/20165/13/2016 10:21:31 AM PASS
WIP on SFHs on Painted Feather and and Mesa Verde. Trash and materials contained, DIs have sediment filters, and perimeter wattles are installed. No discharges or trackout from site. Somerset Village is near capacity. No corrections issues.
ESC11-00192 General Inspection5/13/20165/13/20165/13/2016 10:01:40 AM PASS
ESC15-01357 DOC - Permit Finaled5/13/20165/13/20165/13/2016 9:34:05 AMPPASS
ESC15-01357 Aging Inspection5/13/20165/13/20165/13/2016 9:33:46 AM PASS
Project complete. All permits finaled. ESC conditions satisfied.
ESC15-00560 DOC - Permit Finaled5/13/20165/13/20165/13/2016 8:42:50 AMPPASS
ESC15-00560 General Inspection5/13/20165/13/20165/13/2016 8:42:28 AM PASS
No activitiy at site or on BLD permit - permit expired. No disturbed area or sediment runoff at site. Permit finaled.
ESC15-00496 General Inspection5/13/20165/13/20165/13/2016 8:42:09 AM PASS
No activitiy at site or on BLD permit - permit expired. No disturbed area or sediment runoff at site. Permit finaled.
ESC15-00496 DOC - Permit Finaled5/13/20165/13/20165/13/2016 8:27:49 AMPPASS