Inspections for the day of: Wednesday, May 13, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00443 Site Final5/13/20205/13/20205/21/2020 3:17:11 PMPCANC
ESC18-01235 General Inspection5/13/20205/13/20205/21/2020 3:16:35 PM CANC
ESC18-00946 General Inspection5/13/20205/13/20205/19/2020 3:48:52 PM PASS
Looks like neighbor's retaining wall has been repaired.

No activity at site. Will continue to monitor. No muddy runoff from site observed. Appears vegetation and BMPs installed are working still.

BLD for house expires at the end of July
MIS20-00070 ESC-Conference4/29/20205/13/20205/19/2020 3:37:50 PMPPEND
Not vegetated. No muddy runoff observed, but a lot of runoff from this building and the Crane Creek parking lot
ESC20-00125 Site Preparation5/13/20205/13/20205/13/2020 5:53:52 PMPPASS
See also ESC20-00124

Voyager Subdivsion pre- grading meeting.

Extended ESC permits issued for demolitions(ESC20-00124-125) to cover new subdivsion installation. No GRD permit was required due to no fill and ACHD drainage review.

Will preserve row of trees on east side of parcel along Fivemile. Construction entrance is installed. SWPPP onsite, Steve with CMG will do inspections.

No surface waters, abandoned irrigation ditch on north and west perimeter. Will need to control dust during grading to prevent negative impacts on neighbors.

Approved.
ESC20-00124 Conference5/13/20205/13/20205/13/2020 5:52:36 PMPPASS
Voyager Subdivsion pre- grading meeting.

Extended ESC permits issued for demolitions(ESC20-00124-125) to cover new subdivsion installation. No GRD permit was required due to no fill and ACHD drainage review.

Will preserve row of trees on east side of parcel along Fivemile. Construction entrance is installed. SWPPP onsite, Steve with CMG will do inspections.

No surface waters, abandoned irrigation ditch on north and west perimeter. Will need to control dust during grading to prevent negative impacts on neighbors.

Approved.

ESC19-00678 General Inspection5/13/20205/13/20205/13/2020 5:39:55 PM CANC
ESC20-00002 General Inspection5/12/20205/13/20205/13/2020 5:37:03 PMPPEND
need to pay fine for dumped washout


See notes from Baserri sub SWPPP meeting:

3 PM

Onsite meeting to discuss SWPPP/ESC responsibilities for Basserri Subdivision phases 1-4. Organized by ESC Responsible Person Tim with Hayden Homes land development:

Knife River and Syman doing ESC related activities for land developemnt. Homes in phase 2 permitted seperately with HH RP Alan and Tek Solutions doiong SWPPP inspections:

Knife River duties:
- maintain construction entrance to prevent trackout from work and hauling area. Phase 3 & 4 rock construction entrance is at SE corner off Cole.
- use own leakproof concrete washout facility for any subdivsion concrete worki nstead of Hayden Homes home building washout pan
- have water truck on duty for fugitive dust control. May need to end of day crusting of work areas and stockpiles

Syman Company:
- will sweep subdivsion and access point on Cole once a week on Fridays. Excessive trackout or mud clods on Cole should be cleaned up within 24 hours
- will conduct SWPPP inspections on 2 week frequency and after 0.25" rain events
- during inspections will inspect storm dran sediment bags and do maintenance as needed

Hayden Homes RP Tim shall be notified by Boise ESC Inspectors for all correction requests and will delegate tasks as needed.

Discussed that any bare lots not build upon and causing dust issues will need temporary stabilization/seeding until construciton. Plan is to build out phase 2 this year. No wind blown dust issues observed at time of inspection.

Inspection observation:

Sediment control BMPs installed in subdivision, no violations observed. Minor trackout from construction entrance due to rain earlier in day, Request to scrape/maintain construction entrance rock or widen so all vehicles have to pass over track pad
ESC19-00303 General Inspection5/12/20205/13/20205/13/2020 5:35:45 PMPPASS
No activity in phase 1. sediment sacks installed, perimeter fencing installed. RP to notify for close.

See notes for rest of Baserri meeting conducted


3 PM

Onsite meeting to discuss SWPPP/ESC responsibilities for Basserri Subdivision phases 1-4. Organized by ESC Responsible Person Tim with Hayden Homes land development:

Knife River and Syman doing ESC related activities for land developemnt. Homes in phase 2 permitted seperately with HH RP Alan and Tek Solutions doiong SWPPP inspections:

Knife River duties:
- maintain construction entrance to prevent trackout from work and hauling area. Phase 3 & 4 rock construction entrance is at SE corner off Cole.
- use own leakproof concrete washout facility for any subdivsion concrete worki nstead of Hayden Homes home building washout pan
- have water truck on duty for fugitive dust control. May need to end of day crusting of work areas and stockpiles

Syman Company:
- will sweep subdivsion and access point on Cole once a week on Fridays. Excessive trackout or mud clods on Cole should be cleaned up within 24 hours
- will conduct SWPPP inspections on 2 week frequency and after 0.25" rain events
- during inspections will inspect storm dran sediment bags and do maintenance as needed

Hayden Homes RP Tim shall be notified by Boise ESC Inspectors for all correction requests and will delegate tasks as needed.

Discussed that any bare lots not build upon and causing dust issues will need temporary stabilization/seeding until construciton. Plan is to build out phase 2 this year. No wind blown dust issues observed at time of inspection.

Inspection observation:

Sediment control BMPs installed in subdivision, no violations observed. Minor trackout from construction entrance due to rain earlier in day, Request to scrape/maintain construction entrance rock or widen so all vehicles have to pass over track pad
ESC20-00124 Conference5/13/20205/13/20205/13/2020 5:34:11 PMPCANC
duplicate entry
ESC19-00304 Conference5/12/20205/13/20205/13/2020 5:33:41 PMPPASS
3 PM

Onsite meeting to discuss SWPPP/ESC responsibilities for Basserri Subdivision phases 1-4. Organized by ESC Responsible Person Tim with Hayden Homes land development:

Knife River and Syman doing ESC related activities for land developemnt. Homes in phase 2 permitted seperately with HH RP Alan and Tek Solutions doiong SWPPP inspections:

Knife River duties:
- maintain construction entrance to prevent trackout from work and hauling area. Phase 3 & 4 rock construction entrance is at SE corner off Cole.
- use own leakproof concrete washout facility for any subdivsion concrete worki nstead of Hayden Homes home building washout pan
- have water truck on duty for fugitive dust control. May need to end of day crusting of work areas and stockpiles

Syman Company:
- will sweep subdivsion and access point on Cole once a week on Fridays. Excessive trackout or mud clods on Cole should be cleaned up within 24 hours
- will conduct SWPPP inspections on 2 week frequency and after 0.25" rain events
- during inspections will inspect storm dran sediment bags and do maintenance as needed

Hayden Homes RP Tim shall be notified by Boise ESC Inspectors for all correction requests and will delegate tasks as needed.

Discussed that any bare lots not build upon and causing dust issues will need temporary stabilization/seeding until construciton. Plan is to build out phase 2 this year. No wind blown dust issues observed at time of inspection.

Inspection observation:

Sediment control BMPs installed in subdivision, no violations observed. Minor trackout from construction entrance due to rain earlier in day, Request to scrape/maintain construction entrance rock or widen so all vehicles have to pass over track pad
ESC19-00303 General Inspection5/12/20205/13/20205/13/2020 4:52:58 PMPCANC
ESC19-00757 Site Final5/13/20205/13/20205/13/2020 4:51:59 PMPPASS
Sign installed. No disturbed area, no temp BMPs. ESC permit finaled.
ESC18-01466 Site Final5/12/20205/13/20205/13/2020 4:36:00 PMPPASS
Work complete. BLD finaled, site landscaped, temp storm drain sediment bag removed. ESC permit finaled.
ESC18-01667 Site Final5/6/20205/13/20205/13/2020 2:38:50 PMPPASS
Disturbed areas stabilized. No temporary BMPs left on surrounding streets. No ESC requests. All permits finaled.
ESC19-00203 Aging Inspection5/13/20205/13/20205/13/2020 2:32:07 PM PASS
No trackout. Perimeter sidewalks clean. Trash contained. No corrections requested
MIS20-00070 ESC-Conference4/29/20205/13/20205/12/2020 1:35:55 PMADONE
No sediment leaving site. Hill doesn't seem to be vegetating. Follow up scheduled. BLD permit is still open

note - entry is from 4/29. new inspection on schedule