Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00416 General Inspection5/10/20185/14/20185/18/2018 8:10:56 AMPPART
Inspected 5/17 AM

Sediment behind wattles had been maintained prior to recent storm. No sediment runoff to neighbor observed.

Large gully between homes has increased in size. RP-GC is aware and will be repair once framers are done at site next week.

Correction requests:
- pick up all loose trash around both sites
- add additional wattle and/or sand retention area at bottom of gully.
- change out DI bag on upper side of Sand Dune.

Follow up schedule. Verbal correction request to Shane Jayo
ESC17-01125 General Inspection5/10/20185/14/20185/16/2018 2:37:18 PMPPART
Sediment deposited on sidewalk and in gutter has been cleaned.

Perimeter wattle length has been increased

Slope interupting wattle is not properly trenched in and rills are visible underneath wattle.

Need to properly trench in and re-install with stakes every 4 ft. Clean dirt collected behinde bottom wattle to increase capcity for trapping sediment.

ESC17-00706 General Inspection5/10/20185/14/20185/16/2018 2:29:57 PMPCANC
ESC16-01725 General Inspection5/14/20185/14/20185/16/2018 2:29:34 PM CANC
ESC16-01724 General Inspection5/14/20185/14/20185/16/2018 2:29:09 PM CANC
ESC16-00778 Aging Inspection5/14/20185/14/20185/15/2018 3:23:18 PM CANC
ESC17-00842 General Inspection5/14/20185/14/20185/15/2018 11:51:51 AMPPASS
No new erosion or sediment runoff issues observed post rain event. BMPs in good condition, site was inspected yesterday.

Correction requests for the next week:
- clean up damaged sand bags.
- install new DI bag on east side of Lancaster.
ESC18-00020 General Inspection5/14/20185/14/20185/15/2018 8:29:44 AMPFAIL
Inspection conducted 5/14. Post rainfall event inspection.

Significant sediment runoff to streets and gutters through out Harris North

- settled dirt on Barber Dr. @ Harris Ranch Road needs to be cleaned up and DI bags changed out. The two hill-side parcels along Barber at entrance have some erosion occuring. Perimeter sediment controls are needed. Sweep Harris Ranch Road all the way to Timbersaw Dr.

- Runoff down Barber Dr. before reaching Hootowl has created new parallel channel to the rip rap channel. Appears water in gutter is jumping sidewalk apron and eroding new channel. Water bars walking path should also be used.

- Trackout from top of hill site where earth is being excated for Wolf Tree Square and runoff from this area are sources of muddy runoff. Need better entrance, a retention area or better check dams. Change DI bags down gradient from this point.

- NE lot on corner of Trapper and Barber needs perimeter wattles

- sloped lots on back side of Barber have sediment runoff coming from each of their entrances. Earthen berm or other sediment control should be installed.

- on fire access road, the runoff in the north rip rap channel is flowing out of the lined channel and causing erosion along the side of the channel just above the creek.

- new community pool needs new perimeter sediment controls and a construction entrance.(see also ESC17-01662)

Corrections discussed with Syman and Harris North.
ESC17-00096 Aging Inspection5/14/20185/14/20185/14/2018 2:35:14 PM CANC
ESC18-00128 Complaint Inspection5/14/20185/14/20185/14/2018 2:22:41 PMPFAIL
check for perimeter controls

Correction request to install perimeter wattle just to the north of the Barber Junction subdivision fence and in between marsh grasses and vegetation.

- pick up trash in ZEC area of Barber Junction.

Verbal correction to RP Ben. Follow up scheduled Wednesday AM 5/16
ESC16-00970 Aging Inspection5/14/20185/14/20185/14/2018 2:10:20 PM CANC
ESC16-01580 General Inspection5/14/20185/14/20185/14/2018 9:48:36 AM PASS