PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, May 15, 2017
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
MIS17-00159
ESC-Conference
5/12/2017
5/15/2017
5/15/2017 3:29:26 PM
A
PASS
Trackout and loose dirt on Yorl Street and sidewalk has been swept up and cleaned. Will keep MIS open till BLD permits are turned in for new SFH(s). Lot has not yet been divided in multiple parcels.
ESC17-00557
Site Preparation
5/15/2017
5/15/2017
5/15/2017 3:13:32 PM
P
PASS
Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Onsite DI for construction access area and portion of Wye Substation has had inlet protection installed. Permit sign posted on the fence. WIP. No violations observed. Approved.
ESC17-00231
Site Preparation
5/15/2017
5/15/2017
5/15/2017 1:58:15 PM
P
CANC
ESC14-00719
General Inspection
5/15/2017
5/15/2017
5/15/2017 1:57:48 PM
PASS
ESC12-00403
General Inspection
5/15/2017
5/15/2017
5/15/2017 1:57:48 PM
PASS
ESC16-01682
General Inspection
5/15/2017
5/15/2017
5/15/2017 11:41:49 AM
P
PASS
WIP. Trash contained. Perimeter wattles installed to keep dirt from running off to Horse Trail and onsite storm water pond. All SFHs in progress are in compliance, workers parking on paved areas instead of open lots & dirt.
ESC15-00541
General Inspection
5/15/2017
5/15/2017
5/15/2017 11:39:38 AM
PASS
Hackbery Ranch Phase II homes (Horse Trail) are in progress by Seidl Homes. No trackout or discharges. Work staying within limits of disturbance and surrounding vegetation has been preserved. No
ESC16-01093
Site Final
5/15/2017
5/15/2017
5/15/2017 11:31:04 AM
A
PASS
All temporary BMPs have been removed as requested. ECB below yard has been properly installed and covered with topsoil material. Rock stockpile on adjacent lot has been hauled. ESC permit conditions satisfied. No corrections needed.
ESC13-00524
General Inspection
5/15/2017
5/15/2017
5/15/2017 11:22:26 AM
PASS
Hillsides vegetation in good condition. Most lots in Hackberry Ranch and now built upon. One active home under construction. Temporary DI sediment filter bags are still installed.
ESC16-00406
General Inspection
5/15/2017
5/15/2017
5/15/2017 10:14:19 AM
PASS
Slope vegetation growing well through erosion control blankets. No erosion or slope failures observed. Preserved vegetation between graded area is in good condition. Will recommend potential to plant sage brush on slopes, currently appears to be mostly grasses.
No construction entrance rock at Highland View Drive but road has been swept regularly and both MS4 inlets have mantained filter bags installed. Minimal WIP on site by Knife River and Rock Placing Co.
No new corrections. Will inquire about revegetation project.
ESC16-00696
General Inspection
5/15/2017
5/15/2017
5/15/2017 7:54:19 AM
CANC
Permit finaled. Project covered under ESC16-00697 & -00698
ESC16-00696
DOC - Permit Finaled
5/15/2017
5/15/2017
5/15/2017 7:53:32 AM
P
PASS