Inspections for the day of: Monday, May 16, 2016.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00871 General Inspection5/13/20165/16/20165/16/2016 4:43:47 PMAPASS
WIP on site development for apartments. Permit posted. No trackout from site, no fugitive dust issues or discharges. Not yet complete at re-finishing strip of road where new utilitiew were installed.
ESC16-00385 Site Preparation5/16/20165/16/20165/16/2016 4:19:40 PMPPART
Need to post permit sign visibly. Flat lot with housekeeping being main BMP. Excavator is Wood Bros.; builder is Ryan Construction.
ESC16-00219 Site Preparation5/16/20165/16/20165/16/2016 3:37:44 PMPPASS
Clint Phone #: ###-####

Permit posted, lined washout provided for East Valley. Storm drains have sediment filter mats installed. Approved.
ESC14-00657 General Inspection5/16/20165/16/20165/16/2016 3:29:00 PM PASS
SFHs in progress. BMPs installed. No uncontained/wind blown trash issues. No discharges on or off site observed.
ESC15-01289 DOC - Permit Finaled5/16/20165/16/20165/16/2016 3:02:24 PMPPASS
Home construction in RH#6 complete. Site is landscaped and cleaned. Temp BMPs to remain till RH#6 activity is complete. ESC permit conditions met
ESC15-01267 DOC - Permit Finaled5/16/20165/16/20165/16/2016 3:01:30 PMPPASS
Home construction in RH#6 complete. Site is landscaped and cleaned. Temp BMPs to remain till RH#6 activity is complete. ESC permit conditions met
ESC15-00911 DOC - Permit Finaled5/16/20165/16/20165/16/2016 3:00:40 PMPPASS
Home construction in RH#6 complete. Site is landscaped and cleaned. Temp BMPs to remain till RH#6 activity is complete. ESC permit conditions met.
ESC15-00867 DOC - Permit Finaled5/16/20165/16/20165/16/2016 2:58:25 PMPPASS
Home is now landscaped and occupied. ESC permit conditions satisified.
ESC15-01466 Site Preparation5/16/20165/16/20165/16/2016 2:52:51 PMPPASS
Clint Phone #: ###-####

Yellow permit sign posted, subdivision BMPs are installed; active sites in compliance. Approved.
ESC14-01083 General Inspection5/16/20165/16/20165/16/2016 2:50:19 PM PASS
WIP on townhomes at Park Place. All inlets inside and on Barber Valley Dr. have sediment filter bags that are being monitored and maintained. Trash and materials is contained properly on site. No spills, runoff, or loose sediment in streets and gutters.

New phase under constructiion is not occuring at this time and the roads are not yet installed.
ESC15-00351 Aging Inspection5/16/20165/16/20165/16/2016 1:52:51 PM PASS
ESC15-00352 Aging Inspection5/16/20165/16/20165/16/2016 1:52:30 PM PASS
ESC15-00145 Aging Inspection5/16/20165/16/20165/16/2016 1:09:27 PM PASS
ESC14-00928 General Inspection5/16/20165/16/20165/16/2016 11:34:14 AMPPASS
WIP on exterior. Site perimeter is clean. No corrections issued.
ESC14-01184 Aging Inspection5/16/20165/16/20165/16/2016 11:12:09 AM PASS
WIP.. DI on corner has sediment filter bag installled. No trackuot, yard is landscaped but some site improvements still occuring.1205 Franklin also in progress. No corrections issued.

Will need to remove DI BMP when complete.
ESC16-00481 DOC - Permit Finaled5/16/20165/16/20165/16/2016 10:59:25 AMPPASS
Demo complete. New SFH being constructed under ESC16-00385
ESC15-01101 BMP Violation5/16/20165/16/20165/16/2016 10:47:28 AMPFAIL
Crews washing equipment and mixing cement on sidewalk/roadway (Aggregate & Clements).

Requested to worker on site to move all equipement off sidewalk and contain any wash water. Once dry the area should be swept.

ESC15-00360 General Inspection5/16/20165/16/20165/16/2016 10:45:01 AM PASS
Disturbed area on parcel has revegetated enough to satisfiy ESC permit conditons. Home is occupied, no construction, no materials or sediment running off site. Hillside vegetation/stabilization bond issued.

No further ESC inspections.
ESC15-00360 DOC - Permit Finaled5/16/20165/16/20165/16/2016 10:43:40 AMPPASS
ESC15-01138 Site Preparation5/13/20165/16/20165/16/2016 10:11:36 AMAPASS
Jim Phone #: ###-####

RP-GC Jim onsite walk through inspection. Silt fence installed at the bottom of the lot. There are two projects adjacent to each other and will be built simultaneously.

Permit sign posted, silt fence properly installed. Will use leak-proof portable container for the washout phase.

First phase of project is clearing trees and shrubs and installing geo-grid structures for hillside stabilization. Did not request inlet bag. RP stated he will be onsite daily to monitor trackout and sweeping needs. Will provide trash bin for excavation crew.

Approved for construction.
ESC15-00221 General Inspection5/16/20165/16/20165/16/2016 8:42:56 AM PASS