Inspections for the day of: Friday, May 18, 2018.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00991 Site Final5/18/20185/18/20185/21/2018 3:34:59 PMPPASS
Demolition complete. Road work for VMP and State Street now in progress. ESC permit finaled.
ESC18-00061 Site Final5/18/20185/18/20185/21/2018 3:33:24 PMPPASS
ESC finaled. No corrections.
ESC18-00062 Site Final5/18/20185/18/20185/21/2018 3:30:10 PMPPASS
Demo complete. Roadwork now in progress.
ESC16-00948 General Inspection5/16/20185/18/20185/21/2018 3:18:37 PMAPASS
ESC18-00190 BMP Violation5/18/20185/18/20185/18/2018 4:49:13 PMPFAIL
Washout full. Reportedly using other sites washout without permission and causing track out.

Correction request to provide new concrete washout, post washout sign for Blackrock, and clean up old washout. New washout should have construction entrance.
MIS18-00186 ESC-Conference5/18/20185/18/20185/18/2018 4:45:36 PMAPEND
follow up

Parcel and dirt owner awaiting soil test results to provide hauling company in order to classify the waste and identify proper disposal location.

Main stockpiles have been covered. Some dirt is is still exposed around edges. Area still has hydrocarbon odor. Stockpile set closest to ditch has been pulled away.

Follow up inspection scheduled for 5/21 to check on test results and hauling operation. GC-RP to obtain permit for work, ESC18-00754
ESC18-00466 Site Preparation5/18/20185/18/20185/18/2018 3:35:11 PMPPASS
will bring green ESC signs to RP Weston



Subdivsion BMPs installed. RP on duty. Street sweeper schedule for Hootowl this weekend.

No silt fence required on backside. Sheet flow to Hootowl, earthen berm is on rim side.
ESC16-01410 General Inspection5/18/20185/18/20185/18/2018 3:04:34 PM CANC
ESC17-01172 Tracking Control5/18/20185/18/20185/18/2018 11:04:20 AMAFAIL
No trackout from main site. Significant trackout from employee parking area across the street (Steelhead)

Verbal correction request to RP Darrell to clean up trackout and install construction entrance or implement on street parking only
ESC16-01694 Aging Inspection5/18/20185/18/20185/18/2018 10:50:16 AM FAIL
Permits posted, DI bags installed, no major trackout, RP on duty. Site is not compliance

Corrections needed:

- sweep all sidewalks and gutters
- pick up all loose trash around the "cottages" and in the staging area to the west of job trailer. Have full bins emptied. Add new bins along Mt. Hood.
- clean up inlet and DI bag where paint washout was conducted. Install designated washout areas for washout.
- clean up former washout area. Sweep all dried material off sidewalk and gutter.
- install construction entrance to staging area to prevent trackout.

Verbal correction to RP. Follow up compliance inspection scheduled for Wednesday 5/23
ESC16-01691 Aging Inspection5/18/20185/18/20185/18/2018 10:50:05 AM FAIL
Permits posted, DI bags installed, no major trackout, RP on duty. Site is not compliance

Corrections needed:

- sweep all sidewalks and gutters
- pick up all loose trash around the "cottages" and in the staging area to the west of job trailer. Have full bins emptied. Add new bins along Mt. Hood.
- clean up inlet and DI bag where paint washout was conducted. Install designated washout areas for washout.
- clean up former washout area. Sweep all dried material off sidewalk and gutter.
- install construction entrance to staging area to prevent trackout.

Verbal correction to RP. Follow up compliance inspection scheduled for Wednesday 5/23
ESC16-01662 Aging Inspection5/18/20185/18/20185/18/2018 10:49:55 AM FAIL
Permits posted, DI bags installed, no major trackout, RP on duty. Site is not compliance

Corrections needed:

- sweep all sidewalks and gutters
- pick up all loose trash around the "cottages" and in the staging area to the west of job trailer. Have full bins emptied. Add new bins along Mt. Hood.
- clean up inlet and DI bag where paint washout was conducted. Install designated washout areas for washout.
- clean up former washout area. Sweep all dried material off sidewalk and gutter.
- install construction entrance to staging area to prevent trackout.

Verbal correction to RP. Follow up compliance inspection scheduled for Wednesday 5/23
ESC16-01681 Aging Inspection5/18/20185/18/20185/18/2018 10:49:43 AM FAIL
Permits posted, DI bags installed, no major trackout, RP on duty. Site is not compliance

Corrections needed:

- sweep all sidewalks and gutters
- pick up all loose trash around the "cottages" and in the staging area to the west of job trailer. Have full bins emptied. Add new bins along Mt. Hood.
- clean up inlet and DI bag where paint washout was conducted. Install designated washout areas for washout.
- clean up former washout area. Sweep all dried material off sidewalk and gutter.
- install construction entrance to staging area to prevent trackout.

Verbal correction to RP. Follow up compliance inspection scheduled for Wednesday 5/23
ESC16-01675 Aging Inspection5/18/20185/18/20185/18/2018 10:49:28 AM FAIL
Permits posted, DI bags installed, no major trackout, RP on duty. Site is not compliance

Corrections needed:

- sweep all sidewalks and gutters
- pick up all loose trash around the "cottages" and in the staging area to the west of job trailer. Have full bins emptied. Add new bins along Mt. Hood.
- clean up inlet and DI bag where paint washout was conducted. Install designated washout areas for washout.
- clean up former washout area. Sweep all dried material off sidewalk and gutter.
- install construction entrance to staging area to prevent trackout.

Verbal correction to RP. Follow up compliance inspection scheduled for Wednesday 5/23
ESC17-01586 DOC - Permit Finaled5/18/20185/18/20185/18/2018 10:39:28 AMPPASS
Sign relocation complete. No ESC issues.
ESC18-00063 Random Inspection5/18/20185/18/20185/18/2018 10:36:39 AMPPASS
ESC17-01117 Random Inspection5/18/20185/18/20185/18/2018 10:34:56 AMAPASS
No trackout or discharges. Permit sign posted on job trailer. Construction entrance and MS4 inlet protection installed.
ESC18-00426 Site Preparation5/17/20185/18/20185/18/2018 9:56:38 AMAPASS
9 AM pre-construction meeting

Construction entrance and permit sign to be located on Sunflower Street. Initial access to site will be on existing gravel entrance. Wattles installed along south clearing limits. Top soil will be saved for reuse. Irrigation ditch has already been piped and re-routed, old ditch to be filled in. Will need fugitive dust control.

Approved for construction. Construction to begin in approximately 2 weeks. Follow up scheduled
ESC17-00358 General Inspection5/18/20185/18/20185/18/2018 8:40:42 AM PASS
On hold
ESC15-01420 General Inspection5/18/20185/18/20185/18/2018 8:23:09 AM CANC
ESC17-00806 DOC - Permit Finaled5/18/20185/18/20185/18/2018 8:13:53 AMPPASS
ESC12-00403 General Inspection5/18/20185/18/20185/18/2018 8:13:39 AM CANC
ESC16-01006 Site Preparation5/16/20185/18/20185/18/2018 8:12:07 AMPCANC
ESC17-00985 Conference5/18/20185/18/20185/18/2018 12:00:00 AMPDONE
Double ESC permit fee due to working without permits. Notifed RP Monica on Friday May 4th to pick up permits ASAP, which has not been completed.