Inspections for the day of: Monday, May 18, 2020.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01457 General Inspection5/18/20205/18/20205/22/2020 5:26:29 PM CANC
ESC18-01644 Site Final5/18/20205/18/20205/22/2020 4:37:16 PMPPASS
ESC20-00617 Site Preparation5/18/20205/18/20205/19/2020 5:00:14 PMPPEND
Called GC George to see when project will start.

No activity or disturbance at site yet. No BMPs installed yet. Scheduled follow-up inspection
ESC19-01089 Site Preparation5/18/20205/18/20205/19/2020 4:58:26 PMPPASS
BMPS installed. Posted permit sign. Approved for construction
ESC20-00138 Site Final5/18/20205/18/20205/19/2020 4:56:28 PMPNR
Work complete.

Will continue to monitor site. Americana hillside above chain link fencing needs more time to show that vegetation will establish in this disturbed area
ESC19-00241 General Inspection5/18/20205/18/20205/19/2020 2:58:02 PM PASS
WIP. Parking lot and access is now paved. No ESC requests at this time
ESC19-00283 Site Final5/18/20205/18/20205/19/2020 1:52:03 PMPPASS
Coverage on disturbed area has met 70% revegetation. Jute matting ECB is firmly atatched, no rips or erosion from area observed. No temporary BMPs left behind.

Parks management will remove fencing when they are ready, they may be returning to apply preemergent herbicide to control invasives.

No ESC requests related to construction. ESC permit connditions satisfied.
ESC20-00490 Site Preparation5/18/20205/18/20205/19/2020 12:40:09 PMPPEND
Called RP to check on status of project. Work has not started.

Excavation to start next week. RP Steve will call to notify for BMP inspection/Site Preparation
ESC19-00846 Site Final5/18/20205/18/20205/19/2020 8:11:56 AMPPASS
ESC18-00925 Aging Inspection5/18/20205/18/20205/18/2020 3:05:10 PM CANC
ESC19-00797 Site Final5/18/20205/18/20205/18/2020 11:42:44 AMPPASS
Project complete. Disturbed area has been hydroseeded and facility will conitnue to be managed under Micron's MSGP swmp activites
ESC19-01060 Site Final5/18/20205/18/20205/18/2020 11:32:10 AMPPASS
to be completed and monitored under MSGP,

No City of Boise ESC requests
ESC18-01644 Aging Inspection5/18/20205/18/20205/18/2020 8:46:32 AM CANC
ESC19-01592 DOC - Permit Finaled5/18/20205/18/20205/18/2020 8:38:40 AMPPASS
ESC18-00371 Aging Inspection5/18/20205/18/20205/18/2020 8:34:34 AM CANC