Inspections for the day of: Wednesday, May 2, 2018.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00078 General Inspection5/2/20185/2/20185/7/2018 8:03:30 AM PASS
ESC17-00699 General Inspection5/2/20185/2/20185/3/2018 1:33:48 PM CANC
ESC17-00928 Aging Inspection5/2/20185/2/20185/3/2018 1:33:38 PM CANC
ESC17-00932 Aging Inspection5/2/20185/2/20185/3/2018 1:17:54 PM CANC
ESC16-00935 General Inspection5/2/20185/2/20185/3/2018 12:23:11 PM CANC
rescheduled
ESC18-00440 BMP Violation5/2/20185/2/20185/3/2018 8:12:47 AMPPART
see if washout is cleaned up

Washout box removed as requested, but dried concrete slurry and material on ground was left. Project still in progress, will be required to clean adjacent lot and stabilize area where dirt stockpile is.
ESC17-01362 General Inspection5/2/20185/2/20185/2/2018 1:05:31 PMPPASS
No trackout, fugitive dust at site. Permit signs and SWPPP info onsite. Concrete washout pans located at east exit.

New dewatering plan is now implemented. RP submitted updated copy. Cleaner water from the deeper well point is being pumped to the 4 tanks. A backup pond in case water turns turbid is has been enlargened. Water leaving system is visibly clear. No plume observed in Walling Creek.

A new settling and discharge setup has been installed to the adjacent lot. 4 holding chambers seperated by geotextile covered earthen berms will settle water and allow infiltration. If overflow of basins occurs, water flows through a lined channel to the vegeated banks of Walling Creek where water will sheet flow into the creek. This system started receiving the "maintenance" water from the active trench this morning and has not yet overflowed from the first basin. RP is reporting infiltration and the wind and sum is helping with evaporation.

No corrections needed, discharge is currently clean and site in compliance. Will check levels later this week.
ESC16-01561 General Inspection5/2/20185/2/20185/2/2018 12:57:08 PM PASS
WIP on townhomes in phase. Trash contained and picked up around site. No trackout or fugitive dust observed. No discharges. Concrete washout pans located in open area across BV Drive. No corrections
ESC15-01288 General Inspection5/2/20185/2/20185/2/2018 12:55:51 PM PART
WIP on SFHs. Subdivsion BMPs installed.

Corrections needed:
- order concrete washout service for full pan onsite. Sweep up area around location of washout
- have trash crew pick up construction trash along the central drainage area and in the settling basin area behind active homes on Greybull

Also notified Brighton Homes of corrections.
ESC17-00725 Aging Inspection5/2/20185/2/20185/2/2018 11:44:53 AM PASS
WIP. Subdivision BMPs installed for RH #7. No discharges, spills, or overfull trash bins observed.
ESC17-01302 Random Inspection5/2/20185/2/20185/2/2018 11:21:21 AMAPASS
No activity. BLD still active and under review for plan modification. No violations observed.
ESC17-00519 General Inspection5/2/20185/2/20185/2/2018 11:20:47 AMPPASS
WIP on site development and parcel grading. Project has stayed witin clearing limits. No fugitive dust observed, water trailer is onsite.

Will notify RP to have crew do a trash pick up along the east fence where there is some wind blown construction trash.
ESC17-01360 General Inspection5/2/20185/2/20185/2/2018 11:18:58 AMPPASS
WIP prepping road for paving. No fugitive dust, discharges, or other issues observed.
ESC16-00439 Site Final5/2/20185/2/20185/2/2018 11:18:27 AMPPASS
Phase I complete. All lots are now occupied by stabilized SFHs. DI bags to remain installed for Bonneville Phase 2, site inspected under ESC17-01369.

ESC permit finaled.
ESC17-00785 Aging Inspection5/2/20185/2/20185/2/2018 11:16:58 AM PASS
Home complete and landscaped, no ESC issues. Subdivision BMPs (DI bags on Wagon West @ Columbia) to remain install for ongoing construciton. ESC
ESC17-00953 Site Final5/2/20185/2/20185/2/2018 11:16:01 AMPPASS
Home complete and landscaped, no ESC issues. Subdivision BMPs (DI bags on Wagon West @ Columbia) to remain install for ongoing construciton. ESC
ESC17-01031 DOC - Permit Finaled5/2/20185/2/20185/2/2018 11:15:25 AMPPASS
Home complete and landscaped, no ESC issues. Subdivision BMPs (DI bags on Wagon West @ Columbia) to remain install for ongoing construciton. ESC
ESC17-00942 DOC - Permit Finaled5/2/20185/2/20185/2/2018 11:15:12 AMPPASS
Home complete and landscaped, no ESC issues. Subdivision BMPs (DI bags on Wagon West @ Columbia) to remain install for ongoing construciton. ESC
ESC17-00881 DOC - Permit Finaled5/2/20185/2/20185/2/2018 11:14:43 AMPPASS
Home complete and landscaped, no ESC issues. Subdivision BMPs (DI bags on Wagon West @ Columbia) to remain install for ongoing construciton. ESC
ESC17-00785 DOC - Permit Finaled5/2/20185/2/20185/2/2018 10:41:25 AMPPASS
ESC18-00038 General Inspection5/2/20185/2/20185/2/2018 10:25:13 AMAPASS
WIP. Foundation and walls complete. Some disturbed area in parking lot. Onsite storm drains have sediment protection. NO trackout or discharges from site.
MIS17-00363 MIS-Aging Inspection5/1/20185/2/20185/1/2018 3:42:54 PMAPASS
Project is now permitted, see ESC17-01479