Inspections for the day of: Thursday, May 21, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01457 General Inspection5/21/20205/21/20205/28/2020 4:48:45 PMPPASS
ESC19-00396 General Inspection5/21/20205/21/20205/28/2020 4:48:37 PMPPASS
ESC16-01560 General Inspection5/21/20205/21/20205/22/2020 5:37:36 PM PASS
ESC19-00371 General Inspection5/21/20205/21/20205/22/2020 5:26:47 PMPPEND
Turbidity sample taken @ 4:30 PM Friday 5/22 downstream from rip rap at the outfall 83.3 NTU. Water is almost drained out of the pond. Water is visibly clear coming out of the pipe.

Sample at Warm Springs Road @ 4:40 was 10.5 NTU.

No activity at site. Loose dirt on Ridgepoint by pond needs to be cleaned up. No water coming into pond to test background turbidity.
ESC19-00574 General Inspection5/21/20205/21/20205/22/2020 9:53:15 AM CANC
rescheduled
ESC19-00324 BMP Violation5/21/20205/21/20205/21/2020 4:53:03 PMPPEND
Stopped by site @ 12:30. Streets had rocks and mud removed/cleaned. Workers beginning to clean sidewalk, street sweeper ordered, site response has been prompt.

BMPs for eroded area stabilization and new silt fence to be installed Thursday/Friday. Follow up scheduled

Will notify the developer that all disturbed areas must have either temporary or permanent stabilization on all open areas.

ESC19-00324 General Inspection5/21/20205/21/20205/21/2020 3:28:05 PMPFAIL
post rainfall inspection 5/20 3:45 pm


Failed stormwater controls berms sent muddy water (out of range >1000 NTU)and rocks down to Teresa. Mud and dirty water pooled on Teresa, some mud has affected neighbors driveways. Runoff also carried sediment off the bare home lots.



In addition to the large armount of rain, the erosion has been caused by the bare disturbed slope area, the nearly 1 acre of area has been at grade since end of March with only tracking and stormwater control berms installed, City last notified site to hydroseed/stabilize this area to meet stabilization deadlines on April 15, which were over due at that time

.

Muddy water in stormwater ditch that flows under Warm Springs Road to stormwater retention depression, which was overflowing to undeveloped and rock piles and open area



Correction requests:
- clean up all mud, rocks, and work with neighbors to clean up their driveways.
- do maintenance on sediment bags
- schedule hydroseed/tacifier for common area on slope that had the most erosion
- install silt fence on inside of curve instead of dirt berm. Dirt berms should no longer be put on any slope, only at the top of slopes
- clean mud out of the drainage ditch
ESC19-01767 General Inspection5/21/20205/21/20205/21/2020 2:59:12 PMPPASS
Permit posted, washout pan on site. RP answered phone

Gene 986 200 2232
ESC19-00860 Aging Inspection5/21/20205/21/20205/21/2020 2:56:47 PM CANC
rescheduled for site final
ESC19-00768 Aging Inspection5/21/20205/21/20205/21/2020 1:02:50 PM CANC
rescheduled for site final
ESC19-00245 Conference5/19/20205/21/20205/21/2020 12:24:32 PMADONE
11 AM with Shane

Site inspection to check if ready for site final.

Revegetation is approximately 70% coverage, no runoff risk at site due to site topography and depressions. RP Shane to check with client to see if they would prefer to keep the silt fence installed on the southest property line for future phases. Fence is in decent shape.

No temp BMPs on Sawmill, no construction material left behind. RP to notify when to close out permit or transfer for next phase

ESC18-01022 Conference5/21/20205/21/20205/21/2020 8:57:10 AMACANC
ESC18-00979 General Inspection5/21/20205/21/20205/21/2020 8:35:42 AM CANC
ESC19-00321 Aging Inspection5/21/20205/21/20205/21/2020 8:35:27 AM CANC
ESC19-00943 Aging Inspection5/21/20205/21/20205/21/2020 8:35:03 AM CANC
rescheduled for site final
ESC18-00818 General Inspection5/21/20205/21/20205/21/2020 8:34:28 AM CANC