Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00086 General Inspection5/22/20205/22/20205/29/2020 8:07:41 AM CANC
ESC18-01089 General Inspection5/22/20205/22/20205/27/2020 2:45:15 PM PASS
Homes on Foxgrove in progress. BMPs installed., regular street sweeping scheduled. No corrections requested
ESC20-00490 Site Preparation5/19/20205/22/20205/27/2020 2:44:20 PMPCANC
No activity at site yet. RP-GC has beeen notified to set up site preparation inspection
ESC18-00020 General Inspection5/22/20205/22/20205/27/2020 8:31:39 AM PASS
WIP on homes. No new subdivision development activity on upper phase. Storm drains have sediment protection, concrete washout facility in good condition. No hillside erosion or sediment blowout observed.

Rear hillside drainage with rip rap channel off Trapper seems to have held up during the last rain. The TRM installed at base of riprap has stayed in place and area is vegetating. No significant amounts of mud acuumulated in channel found.
ESC19-00324 General Inspection5/22/20205/22/20205/22/2020 5:45:22 PMPPEND
Clean up of streets is complete. WIP on Teresa connection to Warm Springs. Storm drain sediment bags have been maintained.

Added wattle and silt fence perimter on the section of slope that had erosion and blow out occur. SIlt fence properly installed and J-hooked.

Corrections remaining:
- clean up mud in drainage ditch.
- stabilize all disturbed area that is out of compliance with stabilization deadlines.
ESC19-01706 Complaint Inspection5/22/20205/22/20205/22/2020 5:41:30 PMPPEND
dumping concrete washout?

RP states no concrete has been poured for 3 weeks at the site.

1 or 2 piles of dumped concrete material, also looks like some stucco. Will have the swale cleaned and investigate who may have dumped the material
ESC19-00584 General Inspection5/22/20205/22/20205/22/2020 5:38:36 PM PASS
DI bags installed. Active projects by Black Rock have lined concrete washout.
ESC17-00078 General Inspection5/22/20205/22/20205/22/2020 5:37:49 PM PASS
ESC18-00983 General Inspection5/22/20205/22/20205/22/2020 4:07:40 PMPPASS
No hillside erosion issues observed after large rain event. HOmes permitted separately by Black Rock
ESC19-01473 BMP Violation5/22/20205/22/20205/22/2020 3:45:03 PMPFAIL
No stabilized entrance to concrete washout facility. Trackout on Tornak and Tiger Lily,

Notified Blackrock RP to fix early next week. Follow up scheduled
ESC19-00756 Site Final5/22/20205/22/20205/22/2020 3:33:56 PMPPASS
Homeowner has revegetated with weeds and debris. No material leaving site. No ESC requests for permitee, no further ESC inspections

Bond issued by Public Works for reveg/site stablization in February 2020
ESC19-01756 Site Final5/22/20205/22/20205/22/2020 3:32:22 PMPPASS
Pool complete. No ESC requests, all permits finaled.
ESC19-00943 Site Final5/21/20205/22/20205/22/2020 3:27:15 PMPPASS
Home complete, landscaped and occupied. Pile construction waste and stockpile of dirt on adjacent lot. Previously it was decided that this mess is not part of this project.

No complaints about lot received, so assume lot owner has allowed it. NO ESC requestes.
ESC18-00979 Site Final5/22/20205/22/20205/22/2020 3:13:57 PMPPASS
Work complete. BLD permit finaled. Stormwater retainined on WPS site. No offsite BMPs to be removed. ESC permit finaled, no ESC requests.
ESC19-00928 Site Final5/22/20205/22/20205/22/2020 9:48:37 AMPPASS
Project complete, clean and stabilzed. No ESC requests. A job well done!
ESC19-00928 Aging Inspection5/22/20205/22/20205/22/2020 9:47:47 AM CANC
ESC19-00971 Aging Inspection5/22/20205/22/20205/22/2020 9:43:37 AM CANC
ESC19-00581 General Inspection5/22/20205/22/20205/22/2020 9:00:48 AM CANC
inspections to be covered under the RCH construction permit, ESC19-00091.

BLD permit for pool has been inactive for 10 months
ESC19-00581 DOC - Permit Finaled5/22/20205/22/20205/22/2020 8:50:20 AMPPASS
ESC18-01635 Aging Inspection5/22/20205/22/20205/22/2020 8:48:43 AM CANC
ESC19-00744 Aging Inspection5/22/20205/22/20205/22/2020 8:19:44 AM CANC
rescheduled for site final
ESC19-00747 Aging Inspection5/22/20205/22/20205/22/2020 8:19:31 AM CANC
rescheduled for site final
ESC19-00182 General Inspection5/22/20205/22/20205/22/2020 8:18:36 AM CANC
ESC19-00184 General Inspection5/22/20205/22/20205/22/2020 8:18:24 AM CANC
ESC19-00183 General Inspection5/22/20205/22/20205/22/2020 8:18:10 AM CANC