PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, May 23, 2019
.
Number of inspections:
14
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00661
Aging Inspection
5/23/2019
5/23/2019
5/23/2019 2:57:45 PM
CANC
ESC16-01167
BMP Violation
5/23/2019
5/23/2019
5/23/2019 1:21:26 PM
P
FAIL
Observed GB Readymix concrete truck driver washing out into a full Ecopan and rinsing most material onto the roadway.
Called RP to get new EcoPan and to warn GB that if they need more washout capacity they need to notify project manager.
Verbal correction request to RP Rocky.
ESC18-00805
Site Final
5/16/2019
5/23/2019
5/23/2019 12:03:26 PM
P
PASS
DI bag in front of home has been removed as requested. Home landscaped and stabilized. ESC permit conditions satisfied.
ESC18-01021
General Inspection
5/23/2019
5/23/2019
5/23/2019 12:02:34 PM
PASS
Homeowner in process of landscaping, BLD permit has been finaled and a hillside revegetation bond issued. ESC permit to remain open till final stabilization. No corrections requested, no violations.
ESC18-00926
Aging Inspection
5/23/2019
5/23/2019
5/23/2019 12:01:09 PM
PASS
ESC18-00926
DOC - Permit Finaled
5/23/2019
5/23/2019
5/23/2019 12:01:01 PM
P
PASS
ESC16-01472
Conference
5/23/2019
5/23/2019
5/23/2019 12:00:42 PM
P
DONE
RP-GC added additional sand bags along Shaw Mtn Road, installed wire back silt fence in two locations as well as the gator guard wattle that were dislodged by the concentrated flow. Homeowner had the St. Francis Woods apartment's parking lot cleaned.
Onsite confernece with ACHD stormwater quantity team to looks the runoff from the road. No final decision or solution was reached, more investigation needed.
Public Works will come to remove the lower section of orange silt fence and wattle once the yard is landscaped and has all onsite drainage swales constructed.
For temporary prevention of more flooding, a wire -backed silt fence will be installed across of Logan alley to direct runoff onto the lower section of parcel. Additional storage space will be added in this area to prevent flooding and continued flow to the south side of the alley.
ESC18-01002
General Inspection
5/23/2019
5/23/2019
5/23/2019 11:52:59 AM
PASS
No new activity. No trackout or discharges from site. Concrete washout pan still onsite.
ESC18-01005
General Inspection
5/23/2019
5/23/2019
5/23/2019 8:16:42 AM
CANC
to be rescheduled for June Micron inspection.
ESC16-00556
General Inspection
5/23/2019
5/23/2019
5/23/2019 8:14:55 AM
CANC
ESC16-00879
General Inspection
5/23/2019
5/23/2019
5/23/2019 8:14:45 AM
CANC
ESC18-00927
Aging Inspection
5/23/2019
5/23/2019
5/23/2019 8:12:06 AM
CANC
BLD permit for pool is expired, no ESC issues
ESC18-00927
DOC - Permit Finaled
5/23/2019
5/23/2019
5/23/2019 8:11:34 AM
P
PASS
ESC16-00406
General Inspection
5/10/2019
5/23/2019
5/22/2019 12:36:02 PM
P
PEND
Sediment runoff and hillside erosion in previously mentioned areas of phase 1 had increased erosion. Crews are now onsite and getting direction for slope repair (excavation/fill, slope tracking, and wattle reinstallation). All DIs are to be changed out and additional permiter controls on lots with runoff issues.
All corrections listed are still in progress. Compliance follow up has been extended to Friday May 31.