Inspections for the day of: Thursday, May 23, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00661 Aging Inspection5/23/20195/23/20195/23/2019 2:57:45 PM CANC
ESC16-01167 BMP Violation5/23/20195/23/20195/23/2019 1:21:26 PMPFAIL
Observed GB Readymix concrete truck driver washing out into a full Ecopan and rinsing most material onto the roadway.

Called RP to get new EcoPan and to warn GB that if they need more washout capacity they need to notify project manager.

Verbal correction request to RP Rocky.
ESC18-00805 Site Final5/16/20195/23/20195/23/2019 12:03:26 PMPPASS
DI bag in front of home has been removed as requested. Home landscaped and stabilized. ESC permit conditions satisfied.
ESC18-01021 General Inspection5/23/20195/23/20195/23/2019 12:02:34 PM PASS
Homeowner in process of landscaping, BLD permit has been finaled and a hillside revegetation bond issued. ESC permit to remain open till final stabilization. No corrections requested, no violations.
ESC18-00926 Aging Inspection5/23/20195/23/20195/23/2019 12:01:09 PM PASS
ESC18-00926 DOC - Permit Finaled5/23/20195/23/20195/23/2019 12:01:01 PMPPASS
ESC16-01472 Conference5/23/20195/23/20195/23/2019 12:00:42 PMPDONE
RP-GC added additional sand bags along Shaw Mtn Road, installed wire back silt fence in two locations as well as the gator guard wattle that were dislodged by the concentrated flow. Homeowner had the St. Francis Woods apartment's parking lot cleaned.

Onsite confernece with ACHD stormwater quantity team to looks the runoff from the road. No final decision or solution was reached, more investigation needed.

Public Works will come to remove the lower section of orange silt fence and wattle once the yard is landscaped and has all onsite drainage swales constructed.

For temporary prevention of more flooding, a wire -backed silt fence will be installed across of Logan alley to direct runoff onto the lower section of parcel. Additional storage space will be added in this area to prevent flooding and continued flow to the south side of the alley.
ESC18-01002 General Inspection5/23/20195/23/20195/23/2019 11:52:59 AM PASS
No new activity. No trackout or discharges from site. Concrete washout pan still onsite.
ESC18-01005 General Inspection5/23/20195/23/20195/23/2019 8:16:42 AM CANC
to be rescheduled for June Micron inspection.
ESC16-00556 General Inspection5/23/20195/23/20195/23/2019 8:14:55 AM CANC
ESC16-00879 General Inspection5/23/20195/23/20195/23/2019 8:14:45 AM CANC
ESC18-00927 Aging Inspection5/23/20195/23/20195/23/2019 8:12:06 AM CANC
BLD permit for pool is expired, no ESC issues
ESC18-00927 DOC - Permit Finaled5/23/20195/23/20195/23/2019 8:11:34 AMPPASS
ESC16-00406 General Inspection5/10/20195/23/20195/22/2019 12:36:02 PMPPEND
Sediment runoff and hillside erosion in previously mentioned areas of phase 1 had increased erosion. Crews are now onsite and getting direction for slope repair (excavation/fill, slope tracking, and wattle reinstallation). All DIs are to be changed out and additional permiter controls on lots with runoff issues.

All corrections listed are still in progress. Compliance follow up has been extended to Friday May 31.