Inspections for the day of: Wednesday, May 27, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00076 General Inspection5/27/20205/27/20206/4/2020 1:34:03 PM CANC
ESC19-00041 General Inspection5/27/20205/27/20205/29/2020 8:07:52 AM CANC
ESC20-00160 Site Preparation5/26/20205/27/20205/27/2020 2:48:15 PMPPASS
1 PM Dan Koski

RP on duty. Warner Construction doing the dirt work. Construction entrance trackpad installed on Lemp. Recieving storm drains have sediment protection.

WIll use existing vegetation and curb instead of wattle. When curb or vegetation must be disturbed, will be replaced by perimeter wattle.

Warner foreman to install washout facility after mass excavation.

Permit signs provided. Approved for construction
ESC18-01687 General Inspection5/27/20205/27/20205/27/2020 2:43:32 PM PEND
revegetation and monitoring in progress. No corrections at this time
ESC20-00617 Site Preparation5/19/20205/27/20205/27/2020 2:27:00 PMPPEND
No activity at site yet. Will continue to monitor
ESC19-00902 General Inspection5/27/20205/27/20205/27/2020 12:37:03 PM CANC
ESC19-00369 DOC - Permit Finaled5/27/20205/27/20205/27/2020 8:36:24 AMPPASS
BLD expired. No exterior disturbance outside property gate.
ESC19-00114 General Inspection5/27/20205/27/20205/27/2020 8:35:29 AM PASS
No erosion observed. Yard now vegetating with weeds & cheet grass in uppper areas.
ESC16-00935 General Inspection5/27/20205/27/20205/27/2020 8:34:09 AM CANC
ESC19-00587 Aging Inspection5/27/20205/27/20205/27/2020 8:33:30 AM CANC
rescheduled for site final
ESC19-00588 Aging Inspection5/27/20205/27/20205/27/2020 8:32:57 AM CANC
rescheduled for site final
ESC19-00278 DOC - Permit Finaled5/27/20205/27/20205/27/2020 8:32:17 AMPPASS