Inspections for the day of: Wednesday, May 29, 2019.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01089 General Inspection5/29/20195/29/20196/3/2019 8:18:01 AMPCANC
ESC18-01188 Site Final5/23/20195/29/20195/31/2019 8:20:33 AMPCANC
ESC18-01333 General Inspection5/29/20195/29/20195/30/2019 3:13:56 PMPPASS
Additional BMPs installed to reduce risk of sediment runoff. Additional gatorgaurd installed above the perimeter.
ESC16-01457 General Inspection5/29/20195/29/20195/30/2019 3:10:41 PMPPASS
sidwalk and gutter were cleaned as requested and fiber wattle installed for a temporary sediment barrier.
ESC16-01472 General Inspection5/29/20195/29/20195/30/2019 3:07:38 PMPPASS
Sheet flow from road has not passed through site. BMPs are installed include sand bag barrier, sand bag check dams, wire back silt fence, and and a silt fence across alley directing runoff to a temporary sediment basin.
ESC19-00324 Site Preparation5/29/20195/29/20195/29/2019 1:01:21 PMPPEND
Pre-construction conference. Project manager Tyrell with Granite is to notify for inspection of completed construction entrance.

Water tank is onsite for grading and dust control,filled by well onsite.

ESC18-01499 BMP Violation5/29/20195/29/20195/29/2019 9:43:11 AMPDONE
Notified contractor Dan about washout requirements and the ESC Responsible Person Class and certfication requirement.

Dan stated crew cleaned up yesterday and that he or Richard or both will take the ESC RP class to learn about required BMPs
ESC18-00020 General Inspection5/29/20195/29/2019 P 
post rainfall inspection