ESC18-01089
| General Inspection | 5/29/2019 | 5/29/2019 | 6/3/2019 8:18:01 AM | P | CANC |
|
|
|
ESC18-01188
| Site Final | 5/23/2019 | 5/29/2019 | 5/31/2019 8:20:33 AM | P | CANC |
|
|
|
ESC18-01333
| General Inspection | 5/29/2019 | 5/29/2019 | 5/30/2019 3:13:56 PM | P | PASS |
|
|
Additional BMPs installed to reduce risk of sediment runoff. Additional gatorgaurd installed above the perimeter.
|
ESC16-01457
| General Inspection | 5/29/2019 | 5/29/2019 | 5/30/2019 3:10:41 PM | P | PASS |
|
|
sidwalk and gutter were cleaned as requested and fiber wattle installed for a temporary sediment barrier.
|
ESC16-01472
| General Inspection | 5/29/2019 | 5/29/2019 | 5/30/2019 3:07:38 PM | P | PASS |
|
|
Sheet flow from road has not passed through site. BMPs are installed include sand bag barrier, sand bag check dams, wire back silt fence, and and a silt fence across alley directing runoff to a temporary sediment basin.
|
ESC19-00324
| Site Preparation | 5/29/2019 | 5/29/2019 | 5/29/2019 1:01:21 PM | P | PEND |
|
|
Pre-construction conference. Project manager Tyrell with Granite is to notify for inspection of completed construction entrance.
Water tank is onsite for grading and dust control,filled by well onsite.
|
ESC18-01499
| BMP Violation | 5/29/2019 | 5/29/2019 | 5/29/2019 9:43:11 AM | P | DONE |
|
|
Notified contractor Dan about washout requirements and the ESC Responsible Person Class and certfication requirement.
Dan stated crew cleaned up yesterday and that he or Richard or both will take the ESC RP class to learn about required BMPs
|
ESC18-00020
| General Inspection | 5/29/2019 | 5/29/2019 | | P | |
|
|
post rainfall inspection
|