Inspections for the day of: Tuesday, May 3, 2016.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01004 General Inspection5/2/20165/3/20165/5/2016 4:14:21 PMPPASS
Follow up inspection

Area of uncontained washout around MS4 has been cleaned. New designated washout area/procedure has been provided.

No trackout or discharges, corrections complete.
ESC14-00809 Site Final4/29/20165/3/20165/4/2016 3:00:32 PMPPASS
get that DI bag out!

DI bag has been removed as requested. No other corrections. All permits finaled.
ESC15-00915 Aging Inspection5/3/20165/3/20165/4/2016 1:53:06 PM PASS
Project complete. Disturbed area stabilized. ESC permit conditons satisfied. All permits finaled.
ESC15-01078 Site Final4/29/20165/3/20165/3/2016 3:32:14 PMPFAIL
No sediment or discharges from site, but home is not yet landscaped by homeowner.

Correction needed at Trailside:

CBH needs to remove all DI bags installed.
ESC15-01038 Aging Inspection5/3/20165/3/20165/3/2016 3:22:16 PM PASS
HOme complete. ESC permit conditions satisfied. New homes still in progress so temp BMPs to remain.
ESC15-01038 DOC - Permit Finaled5/3/20165/3/20165/3/2016 3:21:27 PMPPASS
ESC15-01579 Conference5/3/20165/3/20165/3/2016 3:18:28 PMPPART
Groundwater discharge offsite has now stopped. Main sewer connection is complete, completing line within site. Project coordinator states that there is only 15' of work remaining and dewatering will be completed.

Yesterday the site's RP took turbidity samples up and downstream of site and found discharge to be within allowable turbidity limits.

Today, ESC coordinator, ESC inspector, Brighton Corp, and Pentalon construction inspected site for final corrections:

- sample red clay-like discharge residue to determine if it is a pollutant of concern. Speculating that it is red clay or tannins.
- remove hose and dewatering equipment
- sweep gutter in front of site and change out DI bags
- clean up stretch of Greenbelt within site perimeter
- log information in SWPPP
- schedule meeting with Boise Parks and Rec to inspect potential damage and work out details or repair/cost recovery.
ESC15-00142 General Inspection5/2/20165/3/20165/3/2016 2:07:30 PMAPASS
ESC15-00760 Aging Inspection5/3/20165/3/20165/3/2016 2:07:19 PM PASS
Home remodel in progress. No sediment or other materials leaving site. Earthwork is complete and front yard is vegetated.
ESC15-00463 General Inspection5/3/20165/3/20165/3/2016 1:53:22 PM CANC
ESC15-00762 Conference5/2/20165/3/20165/3/2016 12:24:52 PMADONE
Inspection notes from inspection conducted on Friday April 29:

Walk through BMP inspection with project management team member Bradden.

No significant trackout around site perimeter, leak proof designated concrete washout is provided in staging area. Stormwater DIs have inlet bags installed.

Correction requests:
- sweep up corner of 5th & Broad (started while on site)
- next week after concrete pouring activities and materials can be removed, street sweeping truck will be scheduled either Thursday or Friday.


Note- the stormdrain at 5th and Myrtle is not draining due system issue not related to construction.

Note: Site is seperating waste streams and designating materials suitable for recycling/re-use.

See also ESC15-01395
ESC14-01063 General Inspection5/3/20165/3/20165/3/2016 11:52:02 AM CANC
rescheduled
ESC14-00590 Aging Inspection5/3/20165/3/20165/3/2016 11:51:07 AM PASS
WIP. See ESC14-00588 for inspection details on the District
ESC15-00509 General Inspection5/3/20165/3/20165/3/2016 9:27:40 AM PASS
ESC15-00630 Aging Inspection5/3/20165/3/20165/3/2016 8:14:02 AM CANC
BLD permit expired. No ESC issues at site
ESC15-00630 DOC - Permit Finaled5/3/20165/3/20165/3/2016 8:13:42 AMPPASS
ESC15-00630 DOC - Permit Finaled5/3/20165/3/20165/3/2016 8:13:16 AMPPASS
ESC15-00031 General Inspection5/3/20165/3/20165/3/2016 8:12:41 AM CANC