Inspections for the day of: Friday, May 3, 2019.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00888 General Inspection5/3/20195/3/20195/8/2019 4:01:32 PM PASS
ESC19-00200 Conference5/2/20195/3/20195/3/2019 5:15:31 PMPPASS
1 PM with Craig and Jay w/ Hammett Homes, which will be taking over subdivsion ESC responsibilities.

Corrections discussed:

- replace existing fiber mat sediment protection on storm drains in subdivision and on Forsythia
- install lined concrete washout pit off Lassen with stabilized access, sign,
- Hammett Homes is doing all homes (approx. 3 acres) so will need to file for LEW or CGP 2017 coverage.
- clean up dumped concrete washout.
- post subdivsion sign with information for subcontractors and public. Can post ESC permit signs here.

Reviewed employee parking, material unloading area, preserving vegetation on the lots, and keeping people off lots unless access is necessary. Requested that trash be contained

Dirt stockpiles to be regraded as part of the common area/park.
ESC19-00199 Conference5/2/20195/3/20195/3/2019 5:15:08 PMPPASS
1 PM with Craig and Jay w/ Hammett Homes, which will be taking over subdivsion ESC responsibilities.

Corrections discussed:

- replace existing fiber mat sediment protection on storm drains in subdivision and on Forsythia
- install lined concrete washout pit off Lassen with stabilized access, sign,
- Hammett Homes is doing all homes (approx. 3 acres) so will need to file for LEW or CGP 2017 coverage.
- clean up dumped concrete washout.
- post subdivsion sign with information for subcontractors and public. Can post ESC permit signs here.

Reviewed employee parking, material unloading area, preserving vegetation on the lots, and keeping people off lots unless access is necessary. Requested that trash be contained

Dirt stockpiles to be regraded as part of the common area/park.
ESC18-00885 Conference5/2/20195/3/20195/3/2019 5:14:44 PMPPEND
1 PM with Craig and Jay w/ Hammett Homes, which will be taking over subdivsion ESC responsibilities.

Corrections discussed:

- replace existing fiber mat sediment protection on storm drains in subdivision and on Forsythia
- install lined concrete washout pit off Lassen with stabilized access, sign,
- Hammett Homes is doing all homes (approx. 3 acres) so will need to file for LEW or CGP 2017 coverage.
- clean up dumped concrete washout.
- post subdivsion sign with information for subcontractors and public. Can post ESC permit signs here.

Reviewed employee parking, material unloading area, preserving vegetation on the lots, and keeping people off lots unless access is necessary. Requested that trash be contained

Dirt stockpiles to be regraded as part of the common area/park.
ESC19-00517 Site Preparation5/3/20195/3/20195/3/2019 5:00:26 PMPPASS
Please call Tony ###-#### if you have any questions.

Reviewed ESC BMPs with RP & project manager. Will preserve existing vegetation as much as possible around temporary road and excavated test holes.

Will install wattle at the bottom of the site. Requested that they follow hill contours, trench in and stake every 4 feet.

Approved for construction. RP to contact for information about revegetation seed mix and site final after work is complete.
ESC19-00371 Site Preparation5/1/20195/3/20195/3/2019 4:56:25 PMAPASS
Initial BMPs installed:

- wire back perimeter silt fence installed properly
- lined heavy duty recycled concrete construction entrance installed.
- ESC permit sign and SWPPP board posted at entrance.

Crew beginning to excavate areas to move rock piles at Trent Point to new area and dig temporary clay lined water holding pond. Water to be used for compaction and dust control.

No corrections requested.

ESC18-00853 General Inspection5/3/20195/3/20195/3/2019 10:08:46 AM PASS
Work near completion, most work completed last year. Will final when the temporary ramp installed for Ash Street townhomes is removed.
ESC19-00351 Site Preparation5/2/20195/3/20195/3/2019 10:07:34 AMAPASS
Meeting with RP Mike.

ESC permit sign and SWPPP info posted. Receiving storm drains south and west of site have sediment protection installed.

Employees to park on paved parking lot in empty building next door.

Flat lot, request to put either fence or silt fence around east and south perimeter to control access. Subdivsion to build its own stormwater system. No groundwater anticipated at this time.
ESC18-00737 General Inspection5/3/20195/3/20195/3/2019 8:33:38 AM PART
Need to pick up wind blown trash on the open parcels up hill from the site.

No trackout or discharges. Home frame complete, WIP.