Inspections for the day of: Thursday, May 30, 2019.
Number of inspections: 8
Percentage of inspections complete: 75 %
Percentage of inspections not complete: 25 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00020 General Inspection5/29/20195/29/2019 P 
post rainfall inspection
ESC19-00082 General Inspection5/22/20195/30/20195/30/2019 3:15:09 PMAPASS
check for corrections

Corrections completed:
- wattle staked every 4 feet and trenched.
- excess silt fence cleaned up
- construction entrance rock installed.
- no trackout, WIP hauling away boulders
ESC17-01104 General Inspection5/30/20195/30/20195/30/2019 3:11:22 PM PASS
ESC17-01595 General Inspection5/30/20195/30/20195/30/2019 3:05:24 PM PASS
ESC18-00239 Aging Inspection5/30/20195/30/20195/30/2019 7:48:13 AM PASS
Home complete, subdivsion near completion. Will remove temporary BMPs when all units are complete.
ESC18-00239 DOC - Permit Finaled5/30/20195/30/20195/30/2019 7:47:39 AMPPASS
ESC19-00123 Conference5/29/20195/30/20195/30/2019 7:46:05 AMPDONE
RP-GC has agreed to install silt fence along south limit of the 3 homes.
ESC18-00109 General Inspection5/30/20195/30/2019