PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, May 4, 2018
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-00935
General Inspection
5/3/2018
5/4/2018
5/9/2018 11:12:38 AM
A
PEND
No new violations observed. Disturbed slopes are in process of revegetation. No significant bare areas or erosion rills observed. Final landscaping has not been completed. Foundation and frame complete, WIP on interior.
None of the corrections requested in March appear have been completed other than making the lined drain flow towards the outlet pipe when water collects in it.
Corrections needed:
- remove unused wattle from bottom corner of lot
- install properly trenched in wattle between the drain and bottom corner.
- work with neighbor to replace damaged tree and gravel in driveway as discussed.
ESC15-01579
General Inspection
5/2/2018
5/4/2018
5/8/2018 4:51:43 PM
A
PEND
perimter trash patrol
landscaping around perimeter in progress. No corrections requested at this time
ESC17-00774
General Inspection
5/4/2018
5/4/2018
5/8/2018 4:48:45 PM
P
PEND
Supplemental irrigation to be turned on next week. Banks are vegetating pretty well. Area is still being monitored for stabilization. Roadway runoff from Barber Drive has caused erosion just north of the new culvert...This area will soon be under construction again and addresses issued as part of master plan (per Dave Powell w/ RiverRidge)
ESC17-01672
General Inspection
5/1/2018
5/4/2018
5/7/2018 11:31:51 AM
A
CANC
ESC16-01650
General Inspection
5/4/2018
5/4/2018
5/7/2018 8:04:23 AM
CANC
ESC17-00400
General Inspection
5/4/2018
5/4/2018
5/7/2018 8:03:43 AM
CANC
ESC14-01083
General Inspection
5/4/2018
5/4/2018
5/4/2018 1:12:18 PM
PASS
ESC17-01362
General Inspection
5/2/2018
5/4/2018
5/4/2018 1:11:53 PM
A
PASS
check dewatering
Dewatering ponds have retained water, no discharge from this area. Deeper well point water passing through baffled tanks and discharging in Walling Creek. Turbidity sample downstream for discharge was 4.45 NTU. Site is in compliance.
ESC18-00171
General Inspection
4/24/2018
5/4/2018
5/4/2018 1:09:33 PM
A
PASS
WIP on excavation for foundation and bulding pad. BMPs installed, permit sign posted at entrance. Vegetaation around disturbance has been preserved so far.
ESC15-01210
General Inspection
5/4/2018
5/4/2018
5/4/2018 1:08:31 PM
PASS
No new activity or issues. Upper canyon crest lot will be soon under construction, notified RP-GC of requirements. Storm drains are open for drainage, open lots owned by permittee have had sediment control wattles installed. No spills or dicscharges observed.
ESC18-00311
Site Preparation
5/4/2018
5/4/2018
5/4/2018 9:54:36 AM
A
PASS
RP on site. Permit sign posted. Hillside wattles installed on perimeter. Further BMPs may be required after excavation.