Inspections for the day of: Monday, May 4, 2020.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00935 General Inspection4/27/20204/27/2020   
ESC19-00371 General Inspection5/4/20205/4/20205/6/2020 3:02:07 PMPCANC
ESC18-00164 Conference5/1/20205/4/20205/6/2020 8:16:23 AMPDONE
Request to finish grading on slope below lower road ASAP so it may be hydroseeded before end of May

RP to notify City of schedule
ESC19-00324 Conference5/1/20205/4/20205/6/2020 8:15:17 AMPDONE
Notified RP to provide schedule on hydrosdeeding and request that they hydroseed all lots. Currently only the front slopes have had revegetation implemented.

WIP on sewer pump house and will soon be working on Teresa to change the interection.
ESC18-01168 General Inspection4/29/20205/4/20205/4/2020 3:32:30 PMPPASS
1 PM with Charlie ###-####

BMPs implemented on site

- stormwater controls to direct stormwater from perimeter to within site for retention and limit offsite discharge.
- access points are swept at minimum once per week. No trackout or dirty surfaces observed at site access points.
- concrete washout pans located in multiple locations on site and being serviced at time of inspection
- secondary containment for mixers at the shipping and receiving site
- working on removing dirt and debris in gutters in areas where fencing is tight and difficult for cleaning. On 2nd street will contain both ends of gutter with sand or rock bags
- suggested installing a gatorguard wattle at Bannock that can contain the dirt at the access area but also be driven over by trucks (should be removed for heavy use or tracked equipment)
- suggested installing secondary contaiment for dumpsters or cover to prevent waste mingling with stormwater or leakage

Correction request:
- reinstall wattle along north side of garage on State Street to be staked every 4-5' and be plush to ground with 2" trench.

- work with St. Luke's to prevent compactor leak from their facility from comingling with stormwater from the construction site.
ESC19-00557 General Inspection5/4/20205/4/20205/4/2020 2:48:52 PM PASS
ESC39-00001 Aging Inspection5/4/20205/4/20205/4/2020 8:15:23 AM CANC