PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, May 4, 2020
.
Number of inspections:
7
Percentage of inspections complete:
86 %
Percentage of inspections not complete:
14 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-00935
General Inspection
4/27/2020
4/27/2020
ESC19-00371
General Inspection
5/4/2020
5/4/2020
5/6/2020 3:02:07 PM
P
CANC
ESC18-00164
Conference
5/1/2020
5/4/2020
5/6/2020 8:16:23 AM
P
DONE
Request to finish grading on slope below lower road ASAP so it may be hydroseeded before end of May
RP to notify City of schedule
ESC19-00324
Conference
5/1/2020
5/4/2020
5/6/2020 8:15:17 AM
P
DONE
Notified RP to provide schedule on hydrosdeeding and request that they hydroseed all lots. Currently only the front slopes have had revegetation implemented.
WIP on sewer pump house and will soon be working on Teresa to change the interection.
ESC18-01168
General Inspection
4/29/2020
5/4/2020
5/4/2020 3:32:30 PM
P
PASS
1 PM with Charlie ###-####
BMPs implemented on site
- stormwater controls to direct stormwater from perimeter to within site for retention and limit offsite discharge.
- access points are swept at minimum once per week. No trackout or dirty surfaces observed at site access points.
- concrete washout pans located in multiple locations on site and being serviced at time of inspection
- secondary containment for mixers at the shipping and receiving site
- working on removing dirt and debris in gutters in areas where fencing is tight and difficult for cleaning. On 2nd street will contain both ends of gutter with sand or rock bags
- suggested installing a gatorguard wattle at Bannock that can contain the dirt at the access area but also be driven over by trucks (should be removed for heavy use or tracked equipment)
- suggested installing secondary contaiment for dumpsters or cover to prevent waste mingling with stormwater or leakage
Correction request:
- reinstall wattle along north side of garage on State Street to be staked every 4-5' and be plush to ground with 2" trench.
- work with St. Luke's to prevent compactor leak from their facility from comingling with stormwater from the construction site.
ESC19-00557
General Inspection
5/4/2020
5/4/2020
5/4/2020 2:48:52 PM
PASS
ESC39-00001
Aging Inspection
5/4/2020
5/4/2020
5/4/2020 8:15:23 AM
CANC