Inspections for the day of: Wednesday, May 6, 2015.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00664 General Inspection5/6/20155/6/20155/7/2015 1:50:17 PM CANC
rescheduled for 5/8
ESC15-00363 Site Preparation5/5/20155/6/20155/7/2015 8:06:35 AMACANC
Jeff-call to meet Phone #: ###-####
ESC14-00546 General Inspection5/6/20155/6/20155/6/2015 2:35:42 PM CANC
ESC14-01061 General Inspection5/6/20155/6/20155/6/2015 2:26:34 PM PART
No site prep requested prior to initial excavation.

Flat infill lot within Lowes shopping complex. DI on S. Entertainment has inlet sediment capture bag. Permit posted on job trailer. No issues at time of inspection.

Need washout.
ESC14-00432 General Inspection5/6/20155/6/20155/6/2015 2:16:33 PMPPEND
ESC14-01154 General Inspection5/6/20155/6/20155/6/2015 1:42:25 PMPPASS
WIP on interior and some parking lot improvements. No trackout or discharges. No corrections needed.
ESC14-01011 Site Preparation5/6/20155/6/20155/6/2015 1:03:22 PMPPASS
Nick Phone #: ###-####

Downslope perimeter wattles are trenched in. Contractor/RP replaced existing drop inlet bags on Castello with new filter bags. Old bags were extremely full. Will replenish/stabilize entrance to site after initial grading & grubbing. Permit posted. Approved.

Note: driveway apron and curbing was cracked prior to site work.
ESC14-01184 Random Inspection5/6/20155/6/20155/6/2015 11:46:25 AMPPASS
Frame in progress. Permit posted. Site surrounded by chain linking fencing. Sidewalk vegetation along Locust has been preserved. No trackout or discharges. Approved.
ESC13-01247 General Inspection5/6/20155/6/20155/6/2015 11:22:10 AM PEND
No issues on slope drain installment and hillside is near full stabilization. Utility or landscape work on the north (uphill) side of Starlite culdesace has been performed. Could be Idaho Power or City of Boise PW? Culdesac was swept but some loose sediment remains. Gatorguard wattle improperly installed. Trying to determine who contractor/owner is....
ESC14-00788 Conference5/5/20155/6/20155/6/2015 11:02:16 AMAPASS
requested by RP Lance to discuss removal of silt fence and replacement with alternative BMP. 10AM at site

Silt fence BMP at toe of slope and edge of pavement/ACHD ROW has been replaced by a borrow ditch that will capture sediment runoff. The bank above the ditch is soon to be regraded and stabilized.

Next week paving and curbing will begin. No trackout issues so no need to restore construction entrance at this time. The site will be installing "Pave drain" tiles at entrance.

Site stormwater drainage infrastructure, diversion channels, catch basins, and retaining ponds are already installed. Landscaping around the perimeter will continue through May and June.

No fugitive dust, trackout, or other discharges from site. No corrections at this time.
ESC14-01052 General Inspection5/6/20155/6/20155/6/2015 9:32:59 AM PASS
Grubbing and grading has started at Ashville Commons. Previous discussions with Biltmore RP Jeremy cleared start of project due to initial BMPs (silt fence perimeter, construction entrance) already being installed. No trackout at site.

Site walk through scheduled for tomorrow AM @ 9

Individual 4-plexes covered seperately, see ESC15-00070 to -00083 (13 units, 1 clubhouse/office)
ESC13-01340 Aging Inspection5/6/20155/6/20155/6/2015 8:52:59 AM PASS