Inspections for the day of: Tuesday, May 8, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00193 General Inspection5/8/20185/8/20185/10/2018 3:51:02 PM CANC
ESC16-00625 General Inspection5/8/20185/8/20185/9/2018 3:07:07 PM PASS
ESC17-00711 General Inspection5/8/20185/8/20185/9/2018 3:03:33 PM PASS
ESC16-01561 Complaint Inspection5/8/20185/8/20185/8/2018 4:51:03 PMPFAIL
Corrections needed. Notice issued to RP Zach with Brighton Corp and Braxton with Brighton Homes.

- pick up trash along Walling Creek. Enact daily or other day trash collection around perimeter, in particular along the wetland area.
- provide additional trash box for next set of units on Exacta
- post new SWPPP signage in clear and visible spot next to project
ESC18-00488 General Inspection5/8/20185/8/20185/8/2018 4:46:01 PMPPART
Need to clean up trackout on Timbersaw. follow up inspection scheduled...
ESC18-00127 Complaint Inspection5/8/20185/8/20185/8/2018 4:45:12 PMPFAIL
- pick up trash along Walling Creek path and in vegetation.
- add another trash box on Exacta
- remove straw wattles temporarily when the forklift needs to be used in these areas and re-install or replace when complete.

RP stated that trash pick up will be condcuted today.
ESC18-00177 Site Preparation5/8/20185/8/20185/8/2018 4:43:23 PMPPASS
pre-con meeting DHE townhomes # 7

Knife River is contractor (Rex ###-####), Riverridge engineering project design.

construction entrance on east end of project. Will protect Warm Springs creek channel with silt fence until 404 permit approval to fill the channel as planned.

Standard BMPs required: dust control, trackout prevention and sweeping, concrete washout facility, staging area with safe storage or materials and chemicals on site.

Requested that silt fence crew also pick up loose trash encountered in the area.
ESC18-00133 Site Preparation5/8/20185/8/20185/8/2018 3:57:33 PMPPASS
This project is located behind the Mormon temple on Cole. Call me if you have any questions. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
ESC17-00734 General Inspection5/8/20185/8/20185/8/2018 2:07:57 PM CANC
ESC16-00406 General Inspection5/8/20185/8/20185/8/2018 2:07:49 PM CANC
ESC17-00984 Aging Inspection5/8/20185/8/20185/8/2018 10:14:15 AM PASS
WIP on ADU in backyard. No ESC corrections needed at site. No sediment runoff or uncontained materials.
ESC14-01063 General Inspection5/8/20185/8/20185/8/2018 7:59:46 AM PASS
Inspected 5/7 PM. 2 SFHs in progress on Goshawk. Subdivision BMPs installed. No violations observed.
ESC17-01754 General Inspection4/26/20185/8/20185/7/2018 11:45:12 AMAPASS
No activity at site. No trackout or dust issues observed.

Stockpile of dirt on the southeast end of site will need stabilization if inactive during next inspeciton.