ESC18-01488
| Site Final | 5/8/2019 | 5/8/2019 | 5/8/2019 4:18:25 PM | P | PASS |
|
|
home landscaped and stabilized. Temporary BMPs for subdivision to remain installed.
|
ESC16-00406
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 3:53:27 PM | P | FAIL |
|
|
Corrections needed:
- empty out/replace or remove full sediment bag on Highland View entrance to phase 1 - remove storm drain bags from the old storm drains on Highland View, no longer needed. - remove old SWPPP sign and binder holder or relocate to job trailer and concrete washout area. Post new permit signage. - fix erosion and uncontrolled runoff from lot 7 block 2 along sidewalk and leading down to lot 8 - re-install perimeter controls on lot 8 block 2 - repair eroded slope below lot 8 leading down to Broadstone. - clean up loose dirt on sidewalk below lot 9 block 2 and fix/replace final row of wattle dirt has ran over. - pick up windblown trash on slopes behind lots 3 through 6 on block 3. Lots of plasics caught in bushes. - empty out and replace sediment bags on the storm drains at bottom of Sandpoint. - address rill erosion and damage slope BMPs in between lot 22 and lot 23 on block 2. - maintain/replace sediment bags on storm drains on Broadstone, both are full - remove old washouts that are over 75% full. Clean up dried washout on lot 16 block 3. Provide new washout containment facilities. - install check dams and or wattles in the drainage way behind lot 2 block 1. Drainway leads to an unprocted storm drain in phase 2.
All corrections must be complete/addressed by Thursday May 23rd.
|
ESC16-01457
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 3:10:41 PM | | PASS |
|
|
Storm drain sediment bag has been maintained and re-installed. No new activity on lot. Driveway surface is still not stabilized. ESC permit to remain open.
|
ESC19-00135
| Site Preparation | 5/8/2019 | 5/8/2019 | 5/8/2019 3:06:27 PM | P | PASS |
|
|
Andrew Phone #: ###-####
RP on duty, reviewed scope of work. Existing vegetatiion and perimeter will be preserved. Excavation for home addition will begin soon. Any stockpiles stored in front should have a perimeter sediment control.
Reviewed ESC permit conditions. Approved for construction.
|
ESC18-00905
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 8:29:27 AM | | PASS |
|
|
|
ESC18-00905
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 8:29:19 AM | P | PASS |
|
|
|