ESC16-00159
| General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 4:34:00 PM | P | PASS |
|
|
WIP installing curbing for roads. Utilities already installed. Some loose sediment at site entrances need to be swept up end of day. No fugitive dust observed, water truck on site.
|
ESC13-00684
| General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 3:34:56 PM | | PASS |
|
|
|
ESC15-01333
| Aging Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 3:08:54 PM | | PASS |
|
|
Home complete, landscaped, and occupied. ESC permit satisfied. DI bags to be removed by Hunter upon completion/landscaping of all homes.
|
ESC15-01333
| DOC - Permit Finaled | 6/1/2016 | 6/1/2016 | 6/1/2016 3:06:51 PM | P | PASS |
|
|
|
ESC15-01332
| Aging Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 3:06:18 PM | | PASS |
|
|
Not yet landscaped/stabilized. WIP. No sediment runoff or non-stormwater discharges
|
ESC15-01306
| DOC - Permit Finaled | 6/1/2016 | 6/1/2016 | 6/1/2016 3:01:57 PM | P | PASS |
|
|
Townhome complete, landscaped and occupied. DI bags in alley to be removed by Brighton once all MSD projects are complete. Should be done before end of summer.
|
ESC15-01304
| DOC - Permit Finaled | 6/1/2016 | 6/1/2016 | 6/1/2016 3:01:15 PM | P | PASS |
|
|
Townhome complete, landscaped and occupied. DI bags in alley to be removed by Brighton once all MSD projects are complete. Should be done before end of summer.
|
ESC15-01288
| General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 2:59:12 PM | | PASS |
|
|
WIP on grading for road installation and parcel preparation. Water truck onsite to control dust and being utilized during inspection. Rock construction entrance installed, permit sign and SWPPP onsite. No corrections needed.
|
ESC15-01101
| General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 2:57:30 PM | | PEND |
|
|
Home complete and BLD finaled, final landscaping in progress. No temp BMP removal needed but requested that street, sidewalk, and down stream sediment from site be removed from gutter in order to final ESC permit.
|
ESC15-01138
| General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 2:49:02 PM | | PASS |
|
|
Lot has been grubbed. No activity at time of inspection. Permit sign posted, silt fence BMP installed properly.
|
ESC16-00625
| Site Preparation | 6/1/2016 | 6/1/2016 | 6/1/2016 2:16:18 PM | P | PASS |
|
|
Jim Phone #: ###-####
Permit sign posted. Silt fence installed along bottom of 2 parcels. 2 sfhs by same builder. Lots were graded and grubbed on ESC15-01138.
No trackout, discharges or other issues at active site. Approved for construction.
|
ESC15-01533
| Site Final | 6/1/2016 | 6/1/2016 | 6/1/2016 12:57:14 PM | P | PASS |
|
|
John Phone #: ###-####
Temp BMP drop inlet filter bag removed. New parking lot, sidewalks and gutters have been swept post construction. Final landscaping in progress. ESC permit conditions satisfied, approved for Final.
|
ESC16-00560
| General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 12:17:36 PM | P | PASS |
|
|
Concrete washout material and residue left in gutter in front and down grade from home has been thoroughly swept and clean.
Onsite Titan Pools supervisor stated that clean up was conducted Friday and that event was lesson to contain washout better and use dams in gutter to prevent flow of washout material beyond site.
|
ESC16-00555
| BMP Violation | 5/31/2016 | 6/1/2016 | 6/1/2016 12:03:02 PM | A | PASS |
|
|
Site was swept up and cleaned as requested. Some work still to be completed, no activity at time of inspection. ESC sign posted.
|
ESC15-01197
| Aging Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 11:46:05 AM | | PASS |
|
|
Garage structure frame and exterior are complete. Additional access driveway recently asphalted. Project appears to be in final stages, BLD open.
ESC should be closed with BLD final and any asphalt chunks or rock on sidewalk gutter should be swept.
No loose dirt leaving site, no corrections issued.
|
ESC16-00427
| Site Preparation | 5/31/2016 | 6/1/2016 | 6/1/2016 11:36:44 AM | A | PASS |
|
|
Site walk through for pedestrian bridge crossing over Eight Mile Creek with RP. Creek has silt fence installed on both sides and vegetated buffer pre-served. Footings will be poured outside of the silt fence and the bridge is a pre-cast 65' span with no in channel work required.
Concrete washout will be contained in portable bin for proper disposal.
|
ESC15-01263
| General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 9:03:49 AM | | PASS |
|
|
No activity. No disturbed area. Permit over 6 months, no extension noted. ESC permit closed.
|
ESC15-01263
| DOC - Permit Finaled | 6/1/2016 | 6/1/2016 | 6/1/2016 8:56:55 AM | P | PASS |
|
|
|