Inspections for the day of: Tuesday, June 12, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01196 General Inspection6/11/20186/12/20186/15/2018 3:35:09 PMAPEND
ESC16-01472 General Inspection6/11/20186/12/20186/13/2018 12:19:43 PMAFAIL
No new erosion or sediment runoff observed.

Wattles are still not staked in areas, no changes to run on area from road.

Loose trash around lower dumpster area has been picked up.

Syman Co. to return to site to re-install sections of wattles that are not staked or trenched.
ESC16-01457 General Inspection6/5/20186/12/20186/13/2018 12:18:08 PMPPASS
Dirt and sand eroded from lot onto sidewalk and gutter has been removed and cleaned up. Sediment filter bag installed on storm drain.

Slope drain pipe installed previously taking water from upper portion to road has been disconnected/removed as requested.

Homeowner stated that landscaping and perimeter wattles will be installed this weekend. No new corrections at this time.
ESC17-00921 Site Final6/12/20186/12/20186/12/2018 2:28:29 PMPPASS
see ESC17-00102 for ESC site final on Cimmaron apartments
ESC17-00921 DOC - Permit Finaled6/12/20186/12/20186/12/2018 2:27:17 PMPPASS
ESC17-00920 General Inspection6/12/20186/12/20186/12/2018 2:26:58 PM PASS
see ESC17-00102 for ESC site final on Cimmaron apartments.
ESC17-00920 DOC - Permit Finaled6/12/20186/12/20186/12/2018 2:22:53 PMPPASS
ESC15-00556 General Inspection6/12/20186/12/20186/12/2018 2:22:46 PM PASS
ESC16-01650 General Inspection6/8/20186/12/20186/12/2018 2:22:35 PMPPEND
No changes or corrective actions completed at site yet.

Request still in order:
- remove silt and sand captured behind silt fence
- rake out and fill rills/gullys.
- remove silt fence

Greenbelt path project to provide estimate for repairing large gully created by runoff from site where silt fence concentrated flow and SFH work on rim increased runoff. Project manager stated the will fill & compact and install erosion control blanket on area of concern and have their crew do the work. In turn they will hydroseed the bank above the silt fence.
ESC17-01298 General Inspection6/8/20186/12/20186/12/2018 2:11:59 PMPFAIL
follow up

No wattles installed as requested. No change in grading or notification of change in landscaping.

Second correction request to Clint. Need to install before the end of the week.
ESC17-01444 General Inspection6/8/20186/12/20186/12/2018 2:11:47 PMPFAIL
follow up

No wattles installed as requested. No change in grading or notification of change in landscaping.

Second correction request to Clint. Need to install before the end of the week.
ESC17-00427 Aging Inspection6/12/20186/12/20186/12/2018 1:16:57 PM CANC
rescheduled for site final
ESC17-00591 General Inspection6/12/20186/12/20186/12/2018 1:16:30 PM PASS
BLD finaled. Will final with landscaping and common driveway cleanup/ temp BMP removal of Taboo culdesac. No violations.
ESC17-00648 General Inspection6/12/20186/12/20186/12/2018 1:15:31 PM PASS
ESC17-00779 Aging Inspection6/12/20186/12/20186/12/2018 8:15:01 AM DEFR
Approved by zone BLD inspector