PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, June 12, 2020
.
Number of inspections:
31
Percentage of inspections complete:
90 %
Percentage of inspections not complete:
10 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01235
General Inspection
6/12/2020
6/12/2020
6/15/2020 4:59:23 PM
PASS
WIP on interior and landscaping. No trackout or sediment runoff occuring. Trash contained. No hillside erosion observed around home, areas that were graded and reseeded have established.
ESC19-00324
General Inspection
6/12/2020
6/12/2020
6/12/2020 1:21:14 PM
P
PASS
Compliance inspection for Notice of Violation issued 5/28/2020
SIte is now in compliance with site stabilization requirements. All disturbed areas have had a temporary tacifiier mulch applied to reduce raindrop erosion and prevent windblown dust.
BMPs have been installed to prevent erosion and runoff of sediment to the street and stormwater in locations where previous runoff has occured during rain events.
- Silt fence and wattle installations are done correctly
- Subdivision storm drains have sediment protection
- staging area access has been fenced to control traffic/prevent trackout.
- streets are clean with no loose dirt or material staged on impervious surfaces.
Work in progress by on Teresa & Warm Springs instersection and lift station.
Corrections requests in the NOV are satisfied and issue resolved, no outstanding requests.
ESC19-01127
Aging Inspection
6/12/2020
6/12/2020
6/12/2020 1:05:23 PM
CANC
ESC19-01127
DOC - Permit Finaled
6/12/2020
6/12/2020
6/12/2020 1:05:19 PM
P
PASS
ESC19-00586
Aging Inspection
6/12/2020
6/12/2020
6/12/2020 1:04:55 PM
CANC
rescheduled for site final
ESC19-01179
General Inspection
6/12/2020
6/12/2020
6/12/2020 1:04:11 PM
CANC
rescheduled for site final
ESC19-01073
Aging Inspection
6/12/2020
6/12/2020
6/12/2020 1:02:46 PM
CANC
ESC18-01636
General Inspection
6/12/2020
6/12/2020
6/12/2020 12:54:59 PM
PASS
ESC17-00018
General Inspection
6/12/2020
6/12/2020
6/12/2020 12:54:38 PM
CANC
ESC19-01098
Aging Inspection
6/12/2020
6/12/2020
6/12/2020 12:52:18 PM
CANC
ESC19-01099
Aging Inspection
6/12/2020
6/12/2020
6/12/2020 12:48:39 PM
CANC
rescheduled for site final
ESC19-00260
Site Final
6/11/2020
6/12/2020
6/12/2020 11:58:13 AM
P
PASS
Work complete. No ESC requests. Temp BMPs in sub to remain for active construction
ESC19-01084
General Inspection
6/12/2020
6/12/2020
6/12/2020 10:46:54 AM
PASS
ESC18-01071
Site Final
6/12/2020
6/12/2020
6/12/2020 9:45:59 AM
P
PASS
Rush Valley phase 1 development complete. Homes in progress by CBH, each SFH permitted seperately.
No ESC requests. Next phases are now in progress under ESC20-00873
ESC19-00795
Site Final
6/12/2020
6/12/2020
6/12/2020 9:44:21 AM
P
PASS
Home complete and landscaped. Will have DI bags removed under ESC19-01589. All units in Farewell Bend now complete.
ESC19-00805
DOC - Permit Finaled
6/12/2020
6/12/2020
6/12/2020 9:44:09 AM
P
PASS
Home complete and landscaped. Will have DI bags removed under ESC19-01589. All units in Farewell Bend now complete.
ESC19-01589
Site Final
6/12/2020
6/12/2020
6/12/2020 9:43:27 AM
P
NR
need to remove DI bags in sub and at Columbia & Brian. Notified Colby
ESC19-01588
Site Final
6/12/2020
6/12/2020
6/12/2020 9:42:37 AM
P
PASS
Home complete and landscaped. Will have DI bags removed under ESC19-01589. All units in Farewell Bend now complete.
ESC19-00596
Site Final
6/12/2020
6/12/2020
6/12/2020 9:42:21 AM
P
PASS
Home complete and landscaped. Will have DI bags removed under ESC19-01589. All units in Farewell Bend now complete.
ESC19-00828
Site Final
6/12/2020
6/12/2020
6/12/2020 9:42:01 AM
P
PASS
Home complete and landscaped. Will have DI bags removed under ESC19-01589. All units in Farewell Bend now complete.
ESC19-00889
Site Final
6/12/2020
6/12/2020
6/12/2020 9:41:44 AM
P
PASS
Home complete and landscaped. Will have DI bags removed under ESC19-01589. All units in Farewell Bend now complete.
ESC19-00796
Site Final
6/12/2020
6/12/2020
6/12/2020 9:41:28 AM
P
PASS
Home complete and landscaped. Will have DI bags removed under ESC19-01589. All units in Farewell Bend now complete.
ESC19-01265
Site Final
6/12/2020
6/12/2020
6/12/2020 9:40:23 AM
P
PASS
ESC19-01590
Site Final
6/12/2020
6/12/2020
6/12/2020 9:40:12 AM
P
PASS
ESC17-00519
Site Final
6/12/2020
6/12/2020
6/12/2020 9:38:51 AM
P
PASS
All units complete. Disturbed area stabilized. No ESC requests for developer. Will have CBH remove the two temporary sediment bags in subdivsion.
ESC20-00379
General Inspection
6/12/2020
6/12/2020
6/12/2020 9:34:47 AM
P
PASS
WIP on rock grinding for utility installation. Rock construction entrance installed, no trackout.
Permit sign posted, no dust issues except at rock grinder, blowing west away from homes, should consider attaching water truck
ESC20-00706
General Inspection
6/12/2020
6/12/2020
6/12/2020 9:30:08 AM
P
FAIL
Todd ###-####
CBH neighborhood supervisor
Spilled concrete slurry/washwater in gutter in front of project. Todd states it was where the former washout was located so could be spill from that.
Need to provide new lined/leakproof concrete washout.
Follow up scheduled
ESC13-00806
General Inspection
6/12/2020
6/12/2020
6/12/2020 9:13:23 AM
CANC
ESC18-01227
General Inspection
6/12/2020
6/12/2020
ESC19-00041
Site Final
6/11/2020
6/12/2020
A
ESC19-00086
Site Final
6/11/2020
6/12/2020
P