Inspections for the day of: Friday, June 15, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01650 General Inspection6/14/20186/15/20186/18/2018 4:35:37 PMAFAIL
follow up

No new erosion or issues obserrved.

Silt fence and accumulated sediment has not been removed as requested.

Developer and Ada County Operations now working on issue of resolving corrective action for significant gully on south side of path after flowing under subdivision silt fence.
ESC17-01298 General Inspection6/14/20186/15/20186/18/2018 4:21:43 PMAPART
follow up to check on perimeter wattle installation

Wattle is now installed along back fence as requested.

Wattle installed not per specifications. No trench. No overlap or tight butting.

ESC17-01444 General Inspection6/14/20186/15/20186/18/2018 4:21:29 PMAPART
follow up to check on perimeter wattle installation

Wattle is now installed along back fence as requested.

Wattle installed not per specifications. No trench. No overlap or tight butting.

ESC17-00827 Site Final6/13/20186/15/20186/18/2018 4:08:27 PMPPASS
Home complete and landscaped. Temp BMPs to remain installed for ongoing SFH construction in RH #7
ESC15-01210 General Inspection6/15/20186/15/20186/18/2018 4:06:10 PM CANC
ESC17-00018 General Inspection6/15/20186/15/20186/18/2018 4:05:07 PM CANC
ESC18-00885 BMP Violation6/15/20186/15/20186/15/2018 5:02:10 PMAFAIL
Work commenced without permits. temporary stop work order till ESC plan review. Double ESC permit fee assessed to project.

ESC plan to be submitted to division for review and approval.

ESC18-00697 DOC - Permit Finaled6/15/20186/15/20186/15/2018 4:59:43 PMPPASS
see ESC18-00885 for subdivision development and infrastructure installation. Demo phase complete.
ESC16-01472 Conference6/15/20186/15/20186/15/2018 4:58:17 PMPDONE
Onsite meeting with RP/GC Dave and Syman Company wattle installation crew.

Reviewed placement and installation specifications on wattle. 2" minimum trench,and backfill compaction, Stakes center of wattle, 5 ft spacing and firmly anchored into ground. Tightly butted wattles will be allowed for this project.

Wattles have been relocated in areas so that crews can still access sides of home without driving over wattle. Relocated top wattle to make a settling area for potential run-on and to spread flows to lower wattles and to Logan ROW north side.

Requested that RP monitor subcontractors that remove any sections of wattle for access that they properly re-install wattles.
ESC16-00329 General Inspection6/15/20186/15/20186/15/2018 3:34:10 PM CANC
ESC17-00678 General Inspection6/15/20186/15/20186/15/2018 3:34:04 PM CANC
ESC17-01170 Aging Inspection6/15/20186/15/20186/15/2018 8:04:15 AM CANC
ESC16-01658 Aging Inspection6/15/20186/15/20186/15/2018 8:04:05 AM CANC
ESC16-01657 Aging Inspection6/15/20186/15/20186/15/2018 8:03:53 AM CANC