Inspections for the day of: Monday, June 15, 2020.
Number of inspections: 14
Percentage of inspections complete: 71 %
Percentage of inspections not complete: 29 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01227 General Inspection6/12/20206/12/2020   
ESC19-00041 Site Final6/11/20206/12/2020 A 
ESC19-00086 Site Final6/11/20206/12/2020 P 
ESC17-01484 Aging Inspection6/15/20206/15/20206/19/2020 3:56:11 PM CANC
ESC18-00497 General Inspection6/15/20206/15/20206/19/2020 1:55:06 PM CANC
ESC19-01358 General Inspection5/29/20206/15/20206/17/2020 3:36:35 PMPPASS
BMPs installed. Site grading on hold during the muddy/wet conditions. No trackout or discharges from site. Permiter BMPs and vegetative buffer in good condition.
ESC19-00371 General Inspection6/15/20206/15/20206/17/2020 9:26:16 AMPPASS
post rainfall inspection

Monday 6/15 turbidity testing:

- background into vortex/Ridgepoint pond: 49.8 NTU
- Vortex/Ridgepoint pond outfall manhole: 81.5 NTU
- Site stormwater outfall to stream: 78.8 NTU
- Downstream below riprap: 71.6 NTU. The discharge at time of inspection was with water qualtiy limit and in compliance.

Observations:

- the corrective action taken by site to clean out all manholes and stormwater bypass system seems to have eliminated the issue of water entering the pipe from the pond and then stirring up deposited mud/sediment in each manhole junction.

- no significant issues observed in upper section of subdivision. Good vegetation, streets paved, silt fence and vegetated buffer perimeter
- stormwater running down Ridgepoint into the pond comes at too great of velocity and volume for the existing riprap spillway in front on the storm drain drop inlets. Erosion occurs on the spillway into the pond
- rilling has started to occur on the dam face and wattle maintenance is needed. No sign of any of the recent seeding application growing. Lots of dirt and mud has been deposited into the center rip rap. No sediment control at bottom end of dam above outfalls.
- Syman onsite for turbiditiy testing and results put in SWPPP
- dewatering out of plugged resevoir into upland vegetation has been approved. Request to place pump hose on pontoon to get top of water column, putting energy dissipation at hose outlet and direct water down existing draw. Did not request to attach silt bag at end of hose in worry of plugging and malfunction.

Correction request:
- schedule wattle mainteance and installation on dam. Apply temporary tacifier or re-seed with mulch.


ESC19-00779 General Inspection6/15/20206/15/20206/16/2020 2:51:29 PM PASS
Clean and stabilized perimeter. NO trackout or dirty stormwater puddles around site. Clean site.
ESC18-00647 Aging Inspection6/15/20206/15/20206/15/2020 4:58:15 PM CANC
ESC19-00178 General Inspection6/15/20206/15/20206/15/2020 4:57:48 PM PASS
ESC19-00082 General Inspection6/15/20206/15/20206/15/2020 4:56:14 PM PASS
Roofing crew parked on street. No trackout, no significant sediment runoff.
ESC17-01693 Aging Inspection6/15/20206/15/20206/15/2020 8:25:04 AM CANC
ESC17-01693 DOC - Permit Finaled6/15/20206/15/20206/15/2020 8:24:58 AMPPASS
ESC18-01022 General Inspection6/15/20206/15/2020 P 
post rainfall inspection