PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, June 17, 2020
.
Number of inspections:
17
Percentage of inspections complete:
71 %
Percentage of inspections not complete:
29 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01227
General Inspection
6/12/2020
6/12/2020
ESC19-00041
Site Final
6/11/2020
6/12/2020
A
ESC19-00086
Site Final
6/11/2020
6/12/2020
P
ESC18-01022
General Inspection
6/15/2020
6/15/2020
P
post rainfall inspection
ESC16-01457
General Inspection
6/17/2020
6/17/2020
6/24/2020 1:48:47 PM
FAIL
Site still not stabilized to prevent erosion. Dirt and debris on sidewalk in front of project and large rill on driveway.
Need to clean up dirt on sidewalk, clean out the temporary sediment bag on driveway, and make adjustments to lot to prevent further erosion.
ESC19-00204
Aging Inspection
6/17/2020
6/17/2020
6/22/2020 2:55:50 PM
PASS
Concrete washout container on site and properly used. No trackout to Denton. WIP on preping parking lot for paving. No corrections.
ESC19-01179
Site Final
6/12/2020
6/17/2020
6/19/2020 11:49:20 AM
P
PASS
ESC18-01773
Aging Inspection
6/17/2020
6/17/2020
6/17/2020 3:59:48 PM
PASS
Lot spaces appear to have been graded to be more level. Lots are bare, no issues observed along the bank of the Blue Lake Resevoir. No trackout. No activity at time of inspection. Excavator machine onsite.
ESC19-00927
General Inspection
6/17/2020
6/17/2020
6/17/2020 3:57:54 PM
CANC
ESC19-01125
General Inspection
6/17/2020
6/17/2020
6/17/2020 3:42:19 PM
P
PASS
No trackout or discharges observed. Parking lot now paved. Workers and equipment staying off mud.
ESC19-00324
General Inspection
6/17/2020
6/17/2020
6/17/2020 3:34:44 PM
P
PASS
No signficant BMP failures after rain events. No new hillside erosion or sediment blowouts.
Site will need to maintain DI bags, check silt fences, and wattle installation once site has dried out.
WIP on intersection and utilies at bottom of site. No trackout to Warm Springs
ESC19-00927
Site Final
6/17/2020
6/17/2020
6/17/2020 3:30:16 PM
P
PASS
Initiial subdivsion work and infrastructure complete. Homes now in progress and permitted separately. No ESC requests, further ESC inspections on this permit.
ESC19-00241
General Inspection
6/17/2020
6/17/2020
6/17/2020 3:28:53 PM
CANC
ESC19-00973
General Inspection
6/17/2020
6/17/2020
6/17/2020 3:28:41 PM
CANC
ESC19-00371
General Inspection
6/17/2020
6/17/2020
6/17/2020 9:55:48 AM
P
PEND
Tuesday 6/16 3 PM
check on dewatering setup and take turbidity samples
Turbidity samples:
- Ridgepoint/Vortex pond inlet pipe (upstream background) : 29.6 NTU
- Ridgepoint/Vortex pond water at outlet end (not manhole) : 67.6 NTU
- End of site discharge outfall in pipe : 92.1 NTU (+ 62 NTU over background)
- Downstream from riprap: 95.5 NTU
- In stream after water from dewatering joins flow:
330 NTU (300 NTU over backgroud)
- At stream at outfall to slough @ Warm Springs Road 271 NTU
Observations:
- dewatering pontoon installed and pump running. Energy dissipation on geotextile and wattle installed properly as requested. Water has not settled enough in pond and flows down hill too fast for vegetation to filter
- dam face is continuing to rill. Too wet for maintenance at this time, site has plan to fix when possible. Dewatering hose leaks have started a new rill in between a section of wattle, muddy water enterining riprap at outfall.
Corrective actions:
- make changes to dewatering system to get water within less than 50 NTU of background (site has turned off pump after being notified of discharge turbidity and is working on plan, follow up scheduled)
- need to address erosion on dam face and sediment running off dam into riprap and beyond
Discharge is not in compliance.
Site is in process of corrective actions. It has been raining everyday and site conditions are preventing maintenance.
ESC19-00618
Aging Inspection
6/17/2020
6/17/2020
6/17/2020 8:47:11 AM
CANC
ESC19-00618
Site Final
6/17/2020
6/17/2020
P