ESC16-01561
| General Inspection | 6/18/2018 | 6/18/2018 | 6/20/2018 12:17:33 PM | | PART |
|
|
Trash mostly picked up. ESC permit signs posted. No fugitive dust, discharges or trackout to Barber Valley.
corrections needed: - direct trash crew to pick up any loose/lightweight trash between buildings along the Walling Creek corridor. - empty the overflowing bin at NW corner of site(remove items and put in the bins with capacity) - remove & clean up wattles that have been driven over and no longer useable
Correction request issued to Braxton with Brighton. Will follow up next week 6/28.
|
ESC16-01560
| General Inspection | 6/15/2018 | 6/18/2018 | 6/20/2018 12:04:01 PM | P | PASS |
|
|
Permit signs and SWPPP posted at Barber Valley Drive @ Parkcenter. No new activity. Area used for staging, stockpile, and concrete washout facility. Veranda project set up a dewatering holding area. No violations observed, no corrections requested.
|
ESC18-00885
| Site Preparation | 6/15/2018 | 6/18/2018 | 6/18/2018 4:51:31 PM | A | PASS |
|
|
Approved for construction.
|
ESC18-00144
| Site Final | 6/18/2018 | 6/18/2018 | 6/18/2018 3:58:26 PM | P | PASS |
|
|
Pool construction is complete. SFH is complete and occupied. Yard landcaped & stabilized. No ESC issues/corrections. Pool has open BLD and ELE permits.
|
ESC17-00105
| Site Final | 6/18/2018 | 6/18/2018 | 6/18/2018 3:53:27 PM | P | PASS |
|
|
BLD finaled. Home is landscaped and stabilized. Temp BMP storm drain protection to remain installed for active projects on Barnside.
|
ESC17-00976
| Site Final | 6/18/2018 | 6/18/2018 | 6/18/2018 3:52:36 PM | P | PASS |
|
|
Pool installed. Disturbed area landscaped/stabilized. ESC permit finaled.
|
ESC16-00225
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 3:39:35 PM | P | PASS |
|
|
No new activity. WIP on SFHs that have seperate ESC permits. No corrections requested at this time.
|
ESC17-00793
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 3:33:03 PM | P | PART |
|
|
No new trackout or discharges. Perimeter wattles are installed.
Correction request to RP Eric: - install wattles or track short steep slope to the left of the garage - extend section of wattle beyond trash box where previous discharges occured. Looks like wattle has been moved.
|
ESC18-00109
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 3:30:16 PM | P | PART |
|
|
Slope above driveway did not vegetate/stabilize as expected. Lots of rills running down the cut bank. Correction request:
- install 2 rows of wattles, 2"minimum trench, firmly anchored every 4-5' - schedule site walk through
Verbal correction to RP Eric.
|
ESC17-01749
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 3:22:54 PM | P | PASS |
|
|
No trackout. Working with in clearing limits, no trackout or offisite discharges observed. Workers parking on culdesac pavement, trash contained. ESC permit sign posted.
|
ESC17-00791
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 3:14:57 PM | P | PART |
|
|
No signs of offsite discharges, no erosion rills or channels observed on slopes. Common drive is now paved and curb and gutter installed.
Correction requests issued to RP Eric: - have earthen berm constructed and edge of parcels to prevent water flowing over slope; or have wattles on slope trenched in minimum of 2 " or more. - install sediment protection on storm drain at end of common drive -post new ESC permit sign
No crew or activity at site. Follow up scheduled for next week
|
ESC18-00334
| Site Final | 6/18/2018 | 6/18/2018 | 6/18/2018 2:56:00 PM | P | PASS |
|
|
Pool complete, surrounding area stabilized. BLD finaled. ESC permit conditions satisfied.
|
ESC17-01289
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 2:43:37 PM | P | PASS |
|
|
WIP on frame. Permit sign posted. No violations observed.
|
ESC17-01135
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 2:37:59 PM | P | PASS |
|
|
Sidewalk and curb now installed. Interior parking is not yet paved. No trackout or discharges down Goodman to Warm Springs. Trash is picked up around site. No corrections requested.
|
ESC17-00375
| General Inspection | 6/15/2018 | 6/18/2018 | 6/18/2018 1:12:28 PM | P | FAIL |
|
|
Correction request:
- clean up washout that is full. - clean up the non-lined washout and provide new portable washout for next project.
Verbal correction request to RP/GC Andy.
|
ESC16-00741
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 12:58:09 PM | | PASS |
|
|
|
ESC17-01720
| Random Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 11:57:50 AM | P | PASS |
|
|
WIP. ESC permit sign posted, no trackout or discharges.
|
ESC18-00280
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 11:54:05 AM | A | PEND |
|
|
ESC BMPs installed. SWPPP and ESC permit sign posted behind Jack CIty Fitness building.
Water lines are being installed for a proposed 3 building storage complex. No commercial grading or drainage permit issued it appears.
Investigation in prgress. ESC pulled early for installation of water line under canal to the Barrister.
|
ESC04-01572
| DOC - Permit Finaled | 6/18/2018 | 6/18/2018 | 6/18/2018 10:09:39 AM | P | PASS |
|
|
|
ESC17-00105
| Aging Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 9:49:20 AM | | PASS |
|
|
|
ESC17-00078
| Site Preparation | 6/15/2018 | 6/18/2018 | 6/18/2018 9:48:53 AM | A | CANC |
|
|
|
ESC17-01196
| Site Preparation | 6/15/2018 | 6/18/2018 | 6/18/2018 8:11:56 AM | P | CANC |
|
|
data entry error
|
ESC16-00406
| General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 8:11:29 AM | | CANC |
|
|
|