Inspections for the day of: Thursday, June 18, 2020.
Number of inspections: 11
Percentage of inspections complete: 55 %
Percentage of inspections not complete: 45 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01227 General Inspection6/12/20206/12/2020   
ESC19-00041 Site Final6/11/20206/12/2020 A 
ESC19-00086 Site Final6/11/20206/12/2020 P 
ESC18-01022 General Inspection6/15/20206/15/2020 P 
post rainfall inspection
ESC19-00618 Site Final6/17/20206/17/2020 P 
ESC19-01066 Site Final6/18/20206/18/20206/26/2020 4:45:02 PMPCANC
ESC19-01099 Site Final6/12/20206/18/20206/26/2020 4:44:18 PMPNR
ESC19-00557 General Inspection6/18/20206/18/20206/18/2020 4:39:11 PM PASS
ESC18-01121 General Inspection6/18/20206/18/20206/18/2020 9:24:27 AM CANC
ESC19-01066 Aging Inspection6/18/20206/18/20206/18/2020 9:24:19 AM CANC
ESC19-00371 General Inspection6/18/20206/18/20206/18/2020 9:13:05 AMPPEND
Wednesday 6/17 5 PM follow up inpsection on dewatering system.

Dewatering pump was turned off at time of inspection. Additional velocity and filtering controls were install downslope of the dewatering bag and the water in the pond will be allowed to settle overnight. Notified RP they are approved to resume dewatering but that the water cannot increase turbidity by over 50+ NTU as it was on Tuesday and Wednesday AM

Turbidity measurements:

- 4:48 PM site discharge pipe 95.1 NTU
- 4:47 PM downstream from site discharge and rip rap: 91.1 NTU
- 4:35 PM bottom of hill @ Warm Springs Road before discharge into slough 52.4 NTU


Will collect samples of dewatering 6/18