Inspections for the day of: Friday, June 19, 2020.
Number of inspections: 12
Percentage of inspections complete: 58 %
Percentage of inspections not complete: 42 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01227 General Inspection6/12/20206/12/2020   
ESC19-00041 Site Final6/11/20206/12/2020 A 
ESC19-00086 Site Final6/11/20206/12/2020 P 
ESC18-01022 General Inspection6/15/20206/15/2020 P 
post rainfall inspection
ESC19-00618 Site Final6/17/20206/17/2020 P 
ESC20-00643 Site Preparation6/18/20206/19/20206/26/2020 4:51:45 PMAPASS
ESC19-00371 General Inspection6/19/20206/19/20206/19/2020 1:54:57 PMPPEND
check on dewatering

Pump turned off. Site is going to allow for more settling and pump on Monday. Request to check turbidity of detention pond surface, and then turbidity of dewatering discharge to the flume/stream that carries water offisite towards Boise River.

Follow up Monday

ESC19-00995 General Inspection6/19/20206/19/20206/19/2020 11:40:33 AM CANC
construction complete, revegetation phase.
ESC19-01146 Aging Inspection6/19/20206/19/20206/19/2020 8:12:00 AM PASS
Demo complete. Lot cleared. No ESC requests
ESC19-01146 Site Final6/19/20206/19/20206/19/2020 8:11:41 AMPPASS
ESC19-01096 Aging Inspection6/19/20206/19/20206/19/2020 8:11:09 AM CANC
ESC19-01096 DOC - Permit Finaled6/19/20206/19/20206/19/2020 8:11:05 AMPPASS